![QuStream AAB6214 Technical Manual Download Page 14](http://html1.mh-extra.com/html/qustream/aab6214/aab6214_technical-manual_3778834014.webp)
I
NTEGRITY
600
–
AES600
F
AMILY
Publication 81-9059-0632-0, Rev. A
June 2008
Proprietary Information of QuStream
3-7
3.4
I
NITIAL
P
OWER
-U
P
It is not necessary to remove power when installing the AAB6214 module into an active chassis frame.
If this is an initial installation, before applying power for the first time, please take time to go back and
verify the following:
•
Check for electrically sound connections, proper connector placement and possible wiring
errors.
•
Ensure that the chassis frame has a connection to a source of in-house sync, if required for the
application.
•
Check that all 600 Series modules, rear panels, power supply and controller modules are
securely installed.
There is no power switch on the frame, and it is powered-up simply by connecting the main power cord
to a source of primary power. Systems with redundant power supply modules have two main power
cords, each of which must be connected to a source of primary power.
When the AAB6214 module is initially powered up, look at the status LEDs located on the module
circuit board and verify proper operation as discussed in Paragraph 3.5.
3.5
AAB6214
S
TATUS
LED
S
There are 5 status LEDs located on the circuit board of each AAB6214 module, as shown in Figure 3-5.
Summary of Contents for AAB6214
Page 25: ......