Replacing the cartridge
– The cartridge must be replaced before it becomes completely saturated.
– The ‘Q’ on the top of the tank is the on / off switch.
– When installed with a Meter: If it is not possible to replace the cartridge when the alarm
sounds, you can temporarily snooze it (for 72 hours) by pressing the wheel on the Scale
Control R Meter.
1
3
2
4
1. Releasing the pressure
Switch off the tank. Activate the boiling
water tap and let the water run until it
is cold. Also run the cold water tap at
the same time. Stop the tap when it is
completely cold. Close the isolation valve
(PRO3 B) or the isolation valve on the
inlet combination valve (PRO3 E).
2. Replacing the cartridge
Detach the saturated cartridge by
unscrewing it out of the head and
replace it with a new one.
3. Flushing out the system
Open the isolation valve (PRO3 B) or the
isolation valve of the inlet combination
valve (PRO3 E ). Ventilate the system by
activating the boiling water tap and run
for 20 seconds. Check for leaks. Now
activate the boiling function again and
let the water run for about 5 minutes, until
the water runs clear. Switch on the tank
using the Q button. Once the water has
heated up again, the Quooker system is
ready to use.
4. When installed with a Scale Control R
Meter: resetting the Meter
Wake-up the Meter by pressing the wheel
once. Turn the wheel to ‘reset’ and press
the wheel to confirm. The screen will go
blank after a short while, it does this to
conserve power.
A
D
B
1
A
D
B
1