BOX INSTALLATION PROCEDURE
Dig a hole big enough to hold
the box containing the operator
(C1)
Insert the tube for water
drainage in the prepared hole
(F1)
Insert the sheath for laying the
power cables
(F2).
Note: while positioning the box,
keep in mind the minimum
distance there must be between
the pillar and the centre of
rotation of the gate hinge.
Cement so that the box cannot
be moved, wait for it to dry and
then assemble the operator and
levers.
Distance between
Pillar - Hinge Centre
375mm
320mm
C1
F 2
F 1
165mm
75mm
www.quikoitaly.com