Step 6
Install unit on Mounting Bracket

Feed the line set stubs/condensate hose/wiring connections through 
the hole in the wall,  then locate the unit key slots onto the tabs on 
the mounting bracket.  Bottom of the unit then latches onto the 
mounting bracket.  Indoor unit is now installed, it should be plumb, 
level and flush with the wall.  If it is not check that the line set stubs 
are completely through the wall penetration, and the wall is plumb

Step 7
Locate Outdoor unit

Clearances for the Outdoor unit are :

 6" Minimum

Install the Outdoor 
unit on a Condenser 

Service 

Pad or if a Heat 

Valves

Pump use feet to 

6" 

12" 

raise unit up approx

Minimum

Minimum

6" to allow for 
defrost to drain away

 24" Minimum

Do not install the Outdoor unit in a location exposed to high winds (field fabricated and installed wind baffle
may be required). 
Ensure location does not impede access around unit and pose a disturbance to neighboring areas

Step 8
Refrigerant Line Set Piping

Interconnecting line set between the Outdoor unit and the Indoor unit, 

MUST

 have both refrigerant lines 

insulated as condensing device is located in the Outdoor unit
Gently bend the line set stubs from the Indoor unit to the desired position
Using 2 x 10"/12" Crescent wrenches remove the flare nuts from the Indoor unit line stubs.
Indoor unit has a holding charge of a dry gas, check for release of this to ensure that no leaks are present
Use a small amount of vacuum pump oil on the male flare threads to ease installation.  Connect the line set to 
the stubs.  Using the 2 wrenches, 1 on the male & 1 on the female tighten the flare nuts

DO NOT INSTALL A LIQUID LINE SIGHT GLASS OR FILTER DRIER IN THE SYSTEM

Run the line set to the Outdoor unit, avoid tight bends and kinking the lines.  Quietside does not recommend 
brazing line sets together or to the unit connections
If line set length is in excess of that required, cut line set and re-flare or coil excess vertically to facilitate oil 
return to the compressor

Installing the
Line Set on the
Indoor unit 
stubs

Installation and Maintenance Manual

Unit Installation (Cont)

Outdoor Unit                     Rear

Front    Condenser Fan 

Line Set Connections
under the GRAY caps

Summary of Contents for QSHC-092

Page 1: ......

Page 2: ......

Page 3: ......

Page 4: ......

Page 5: ......

Page 6: ......

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ...manual 1 Check Rating Plate for correct system voltage before installing the unit Installing and operating a unit with the incorrect voltage may result in malfunction or other issues and will void th...

Page 16: ...t s below 65 DegF so a Low Ambient Head Pressure Controller See accessories is required as is a Crankcase Heater field supplied Residential Bedrooms Family Rooms etc These require ballpark sizing of a...

Page 17: ...ide recommend the Aspen brand of Condensate Pump follow their wiring diagram recommendations This pump is installed externally to the unit Follow Instructions failure to follow instructions may cause...

Page 18: ...ng the weight of the unit Use a level to ensure mounting bracket is leveled so condensate can drain properly Step 5 Prepare Unit Line Set Connections Rotate refrigerant line stubs set gently through 9...

Page 19: ...set between the Outdoor unit and the Indoor unit MUST have both refrigerant lines insulated as condensing device is located in the Outdoor unit Gently bend the line set stubs from the Indoor unit to...

Page 20: ...system installed must have a separate branch circuit with an individual breaker fuse QCIC 09 QCIC 12 QCIC 18 QCIC 24 Breaker Size 15A 15A 15A 20A RLA 6 7A 8 8A 5 3A 8 6A MCA 8 2A 10 8A 6 5A 10 6A QCIH...

Page 21: ...is required then cut the lead and extend it using 18 AWG thermostat wire Sensor is resistance based using 3 5V DC Defrost Sensor wire connection in Outdoor unit is accessed by removing top panel from...

Page 22: ...ture is above 65 DegF to prevent damage to the compressor Unit has a 3 minute time delay for the compressor start up operation Unit is charged with enough R410A refrigerant for a line set of 25ft leng...

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ......

Reviews: