QUICK
BTAC SERIES
INSTALLATION AND USER’S MANUAL - REV002A
10
4 - Installation
4.2 - Thruster
•
We recommend installing the thruster with a support. The motor is supplied with support feet, which are already fitted.
D
•
FIG. 1
The AC motor must be installed on a support adequately sized to support the specified weight and power (see table on
• page 4).
•
FIG. 2
The distance (D) between the centreline of the tunnel and the motor support must allow for correct alignment of motor
• axle to gearbox axle.
•
FIG. 3
The angle between the two shafts (gearbox and motor) shall not /- 1.5°.
•
FIG. 4
To position the thruster in the tube, find the half-way point.
•
FIG. 5
Use the flange to mark the centre of the holes on the tube.
FIG.4
FIG.5
1
0
2
3
4
5
6
7
8
9
10
• FIG. 6
Fix the drilling template on the reference points, making sure they are
aligned with precision at the half-way point of the tube.
N.B. All holes must be exactly aligned with the half-way point of the
tunnel, since tolerance between propeller and tunnel is minimal.
Take care that there are no resin residues in the contact area between flange and
tube; this could cause misalignment. Any resin residues and any other hindrance
to correct contact must be removed with sandpaper.
• Fig. 7A / Fig. 7B
Insert two O-rings into the special
seats inside the flange.
FIG. 7A
FIG. 7B
HULL
TUNNEL
SUPPORT
FIG. 1
FIG. 2
FIG. 3
BTAC 250/300
BTAC B00 386
BTAC C00 386 HD
BTAC 513/610
FIG. 6
BTAC 250/300
BTAC B00 386
BTAC
Series
EN