background image

Getting Started

 

 
 
 
 
 
 

Accessories 

 
The microPAT is supplied with the following accessories:- 
 

 

Charger 

 

Test Lead Set 

 

Short IEC Lead ( used for testing extension leads ) 

 

Charging 

 
The microPAT must only be charged with the supplied charger. It is 
supplied partly charged but we suggest you charge your tester for at least 
1 hour to boost the charge before using for the first time. 
 
Your MicroPAT tester will perform in excess of 2000 tests per full battery 
charge. It can also be used while plugged into the charger. 
 

Battery Indicator 

 
The Battery/Charging indicator will flash green for the 
first hour when connected to the charger. This is a fast 
charge period. After this the indicator will be a steady 
green.  To  fully  charge  the  microPAT  it  needs  to  be 
charged for 24 hours. It is ok to leave it connected to 
the charger. 
 
If an incorrect charger is connected the indicator will flash red and green. 
 
During  testing  if  the  battery  is  low,  the  indicator  will  flash  red.  When  the 
battery is too low for the microPAT to operate correctly the indicator will be 
steady red and the test will stop. 
 
 

WARNING 

Under no circumstance must mains voltage be 

connected to the microPAT 

Summary of Contents for microPAT

Page 1: ...microPAT user manual...

Page 2: ...welfth month and the calibration will be valid for a full twelve months from the due date Contact calibration quick test biz for details PAT Test Training The Quick Test training team have successfull...

Page 3: ...lts Display 5 Switched On Indicator 5 Tests 6 Test Table 6 Identifying Class 1 and Class 2 7 Testing a Class 1 Appliance 7 Testing a Class 2 Appliance 8 Testing an Extension Lead 9 Testing an IEC Lead...

Page 4: ...for surge protected extension leads Tests different lengths of extension leads Appliance switched on check User calibration check In service Inspection Testing Always carry out a full visual inspectio...

Page 5: ...3 Overview Charger Connector Results Indicators Test Buttons Battery Charge Indicator IEC Connector Test Lead Connector Switched On Indicator Appliance Socket...

Page 6: ...e plugged into the charger Battery Indicator The Battery Charging indicator will flash green for the first hour when connected to the charger This is a fast charge period After this the indicator will...

Page 7: ...rresponding red FAIL indicator will light up Additionally the indicator next to the test button will be green or red A new test can be started as soon as the results are being displayed there is no ne...

Page 8: ...al connections This is then used to measure the electrical resistance of the appliance to earth or any exposed metal part This resistance has to be very high to protect the user Insulation Resistance...

Page 9: ...ible to switch the appliance on press the Class 1 button again to proceed with the test The Class 1 test button will flash amber while the test is underway When the test is finished either the green P...

Page 10: ...e Switched on indicator will flash to prompt you to do so If the appliance is then switched on the tester will proceed with the test If it is not possible to switch the appliance on press the Class 2...

Page 11: ...flash amber while the test is underway When the test is finished either the green PASS indicator will light up or the appropriate red FAIL indicators will light up The test button will also be green...

Page 12: ...test instrument should be verified and recorded annually or in accordance with the manufacturer s instructions The microPAT should be formally calibrated annually Please contact Quick Test to arrange...

Page 13: ...ipment 110V and 3 Phase equipment is tested in exactly the same way as any other equipment The only additional requirement is the use of appropriate adapters to connect to the microPAT Please contact...

Page 14: ...1mA Tolerance 5 Limits Class 1 Cable 2M Class 2 4M Supply Voltage 12V 5 Current 400mA max Regulatory Information LVD EN 61010 EMC EN 55011 12 The microPAT is produced by a registered WEEE producer Reg...

Page 15: ...tion Quick Test warrants your microPAT against defects in materials and workmanship for a period of one year from the date of purchase This warranty covers only those defects which arise as a result o...

Page 16: ...www quick test biz...

Reviews: