QUICK-STAR Dubai Assembly Instructions Manual Download Page 3

V

iew fabric cover attached and 

screwed with leg. 

T

he guide roller of 

the cable is horizontal to the pillar! 

Insert the locking pin into the hole 

provided in this position!

V

iew fabric cover from below, the 

cable is arranged e

x

 factor

y

, please do 

not change !! 

N

ow pull the fabric cover 

forward.

V

iew cloth covering pulled out over 

horizontal rail. Shortl

y

 before the end 

position, the cable must be guided 

through the vertical roller as 

illustrated. 

N

ow pull on the rope until 

the end position is reached.

In this position, the roof is completel

y

 

open. 

N

ow 

y

ou can secure this 

position with the locking pin. 

T

o push 

the roof out, remove the pin - pull 

one side of the rope - the elements 

will move together. Finished!

Reviews: