![QUICK-STAR Dubai Assembly Instructions Manual Download Page 3](http://html1.mh-extra.com/html/quick-star/dubai/dubai_assembly-instructions-manual_3645628003.webp)
V
iew fabric cover attached and
screwed with leg.
T
he guide roller of
the cable is horizontal to the pillar!
Insert the locking pin into the hole
provided in this position!
V
iew fabric cover from below, the
cable is arranged e
x
factor
y
, please do
not change !!
N
ow pull the fabric cover
forward.
V
iew cloth covering pulled out over
horizontal rail. Shortl
y
before the end
position, the cable must be guided
through the vertical roller as
illustrated.
N
ow pull on the rope until
the end position is reached.
In this position, the roof is completel
y
open.
N
ow
y
ou can secure this
position with the locking pin.
T
o push
the roof out, remove the pin - pull
one side of the rope - the elements
will move together. Finished!