Quick MILL Andreja Premium Owner'S Manual Download Page 5

Andreja Premium Espresso Machine

 

 

First Time Set Up, Continued 

 

  Before plugging the machine in, verify the steam and hot water knobs are closed 

and the brew lever is in the down position. Also make sure the power switch is in the 

center off “

O

” position and the drip tray is in place. 

 

  Plug the machine into the outlet

*

 and then turn the 

power switch to the fill “

I

**

 position. 

 

  The pump should come on to fill the boiler and then 

will turn off after the boiler has completed filling. 

 

  The boiler should fill in approximately 60-90 seconds.  

If the pump has not turned off and finished filling 

within that time frame then turn the power switch to 

the off “

O

” position and verify the silicone hoses are 

at the bottom of the reservoir and are not kinked. Wait 5 minutes and then turn the 

power switch to the fill “

I

” position. 

 

  After the boiler has finished filling then place whichever portafilter you intend to use 

into the group head. Then lift the brew lever to activate the pump and keep the lever 

up until water comes out of the portafilter and then lower the brew lever.  

 

  Turn the power switch to the on “

II

” position which will activate the heater. 

 

  The heating indicator light will illuminate and the machine will start heating up. You 

will hear some gurgling noises and a small amount of steam and water will be 

discharged into the drip tray. This is normal to allow for the release of air and the 

expanding of water in the boiler and heat exchange. 

 

  The machine should reach temperature in approximately 15 minutes, but to make 

delicious espresso with thick rich crema it is necessary to allow the machine to be 

heated for 30-45 minutes with the portafilter kept in the grouphead.  

 

 

* The electrical outlet must be a 3 prong 120V grounded outlet. No adaptors or extension cords 

should be used. A timer may be used to turn the machine on and off, but it must be a 3 prong 

grounded timer rated for 15 amps. A GFCI outlet is recommended but is not necessary. 
 

** The fill position on the power switch only needs to be used on the first time setup or if the boiler has 

been emptied. The fill switch position allows the boiler to fill without the heater being activated to 

protect it during the fill process. Once the boiler has been filled the machine can be turned on 

normally to the on “II” position. 

 

Power Switch

 

Summary of Contents for Andreja Premium

Page 1: ...Andreja Premium Espresso Machine by Made In Italy Owner s Manual...

Page 2: ...nance 13 Backflushing 13 Plain water backflushing 13 Backflushing with espresso machine cleaner 13 Setting Pump Brew Pressure 14 Setting Pump Pressure On Older Models 14 Setting Steam Pressure 15 Grou...

Page 3: ...Water Reservoir 6 Hinged Reservoir Door 7 Cup Warming Tray 8 Steam Knob 9 Steam Wand 10 Hot Water Knob 11 Hot Water Wand 12 Steam Pressure Gauge 13 Pump brew Pressure Gauge 14 Portafilter 15 E61 Group...

Page 4: ...ardness level exceed three grains then it is strongly recommended that an in tank softener be used or a different source of water that has been tested for hardness Some bottled water can be extremely...

Page 5: ...r the brew lever Turn the power switch to the on II position which will activate the heater The heating indicator light will illuminate and the machine will start heating up You will hear some gurglin...

Page 6: ...maintenance section of the owner s manual The lower gauge is for your pump brew pressure When sitting idle the gauge is reading trapped pressure in the system and may vary To get an accurate pump pres...

Page 7: ...e heater has turned off after reaching the proper boiler pressure This light will also cycle on and off approximately once a minute with the red heating light in order to maintain proper boiler pressu...

Page 8: ...The machine is equipped with 2 floats in the water reservoir to detect the water level When the water level starts to get low an intermittent tone will be heard to notify the user to refill the reser...

Page 9: ...the extraction When it has reached the desired level lower the brew lever to stop the shot It is very important to tamp consistently with the same pressure each time or your shot quality and timing w...

Page 10: ...are doing back to back shots then you should not need to do a cooling flush The length of your cooling flush will determine your brew temperature You can experiment with different flushing times to b...

Page 11: ...time Our recommendation on pitcher choices would be our own Pro Barista Steaming Pitcher which has become the pitcher of choice of the renowned baristas who helped train Chris Coffee Service in this f...

Page 12: ...roximate temperature of 100 degrees or body temperature After your milk has reached this body temperature submerge the tip of the steam arm approximately one inch below the surface of the milk to get...

Page 13: ...w all the remaining bubbles to surface then simply tap the edge of the pitcher on the counter and swirl the milk slightly and they will disappear Be sure to keep your steamed milk moving swirling unti...

Page 14: ...backflush place the portafilter into the group head Then raise the brew lever all the way up for 15 seconds and then lower it Water will forcefully discharge out of the bottom of the group into the d...

Page 15: ...h disc is 9 5 10bar When you make espresso the pressure will be slightly less If the machine puts out 9 5 10 bar of pressure with the backflush disc but then when you make coffee the pressure is less...

Page 16: ...o increase the pressure After adjusting the pressure then plug the machine back in and turn it on and allow it to get up to pressure If you need to make another adjustment then unplug the machine agai...

Page 17: ...from our website at the link below http www chriscoffee com products home e61groupparts faemae61groupscreen Before replacing the group gasket and shower screen the machine should be turned off and co...

Page 18: ...e Group Before installing the new gasket and screen it is very important to clean the group head Make up a solution of hot water and backflushing cleanser Using the provided cleaning brush and cleanse...

Page 19: ...right as possible Then remove the portafilter and re install the insert basket and then work the gasket up further into the grouphead using the portafilter with the basket installed If you are having...

Page 20: ...osen the drain plug by hand until the boiler starts draining When the boiler has completed draining remove the silicone hose tighten the drain plug and re attach the access panel When you are ready to...

Page 21: ...the picture is attached No Water From Hot Water Wand Make sure the machine has been turned on for at least 15 minutes with the power switch in the II heating position Check the upper portion of the g...

Page 22: ...iler Unplug the machine from the outlet and remove the outer body panels Locate the resettable hi limit switch on top of the boiler shown in the picture to the upper right Press the small center butto...

Page 23: ...e reservoir below the water level Make sure the screen on the end of the silicone water line in the reservoir is not clogged with debris Be sure the insert basket is not over filled with coffee and yo...

Page 24: ...ne at 518 452 5995 or by email at service chriscoffee com Please remember Save the shipping carton and all the packing material that came with your machine This is very important should you need to re...

Reviews: