Installation, Operation and Maintenance Instructions
Installation, Operation and Maintenance Instructions
Quest Dry
50Hz Quest F9
1
1-877-420-1330
– Read and Save These Instructions –
TS-1026
02/18 Rev. C
4201 Lien Rd
Phone 608-237-8400
Madison, WI 53704
Toll-Free 1-877-420-1330
www.QuestHydro.com [email protected]
Specifications subject to change without notice.
This manual is provided to acquaint you with the
Quest F9 air mover so that installation, operation
and maintenance can proceed successfully. Ultimate
satisfaction depends on the quality of set up and
a thorough understanding of this equipment. The
Quest F9 is built around tested engineering principles
and has passed a thorough inspection for quality of
workmanship and function.
US Patent D782, O22
Other Patents Pending
50Hz Quest F9:
• 1274
m
3
/hr
750 CFM, 0.7A
• Ultra secure stacking and cord wrap
• All Stainless Steel Fasteners