
150
of diagram IN-H66-039-13
. (Note that you have to trim the decorative molding)
Install the tunnel using the bolts and nuts as show in the diagram
.
Step 12
Approach Side Panel Installation
Refer Drawing IN-H66-039-012 page A-167
Start with the side from the foul line, with item #4, the plastic molding must be flush with the top of the
approach, so be sure to adjust the high of the panel before you fixing it in place.
Counter sink 6 holes per side panel refer to
detail B of drawing IN-H66-039-006A page A-159
screw #6 x 1 5/8”.
Item #5 in front of the approach must be cut to fit each side of the Ball return Hood.
Install the finishing molding of the 2 3/4” capping (Item #11) and the one of the ball track (Item #12 and 13)
Step 13
Lateral Safety Guard Installation (Optional)
The kit includes 6 sections, start by assembling 3 sections with their legs, use the approach leg for the first section.
Refer to
diagram IN-Q200-1010-40 page A-173
for details.
Fix the first 3 sections on the side of the lane as show in
diagram IN-H66-039-014 page A-169
sections, install the decals as show in the same diagram.
Step 14
Scoring Connections
Refer to
drawing IN-ME-B03-003 and IN-ME-B03-004 page A-179 and A-180
to make all connections.
Step 15
Union Kit Installation
Drawing IN-H66-039-025 page A-170 and IN-H66-039-026 page A-171
When you multiple unit to install you must use the union kit, to make the joint between two units.
Install the monitors post as show in
detail C of the diagram IN-H66-039-025 page A-170,
note that you have to
install only one post between two units
.
Cut the lane side panel in two long parts; screw those parts on the side of the lane at 1 1/8” from top of the lane. Once
you have those parts screw in place screw the union finishing panel on top of those parts. (
See Detail B of the
diagram IN-H66-039-025 page A-170)
On the approach frame you have to move the sleeper on each frame that make the union, (
See Detail A of the
diagram IN-H66-039-025 page A-170).
Install the approach union panel support item #2 as show in
detail B of drawing IN-H66-039-026 page A-171.
Install the pit frame union plank item #6 as show in
detail A
of drawing IN-H66-039-026 page A-171.
Once the kickback are all installed, screw in place the front kickback union panel item #7.
Summary of Contents for Highway 66
Page 1: ...Copyright 2006 QubicaAmf Worldw ide Version 1 3...
Page 2: ......
Page 5: ......
Page 14: ...INTRODUCTION TO HIGHWAY 66 Identifying Your Highway 66 System Components 14...
Page 18: ......
Page 28: ......
Page 42: ......
Page 46: ...TAKING CARE OF YOUR HIGHWAY 66 46...
Page 47: ...TAKING CARE OF YOUR HIGHWAY 66 47...
Page 58: ...WIRING DIAGRAMS General Wiring 58...
Page 59: ...WIRING DIAGRAMS WIRING DIAGRAMS 59 Power Box Wiring 59...
Page 60: ...WIRING DIAGRAMS Electronics Wiring 60...
Page 61: ...WIRING DIAGRAMS Joystick Diagram 61...
Page 62: ...WIRING DIAGRAMS Coin Mechanism Coin Comparator 62...
Page 65: ...WIRING DIAGRAMS WIRING DIAGRAMS 65 Joystick control cable 65...
Page 66: ...WIRING DIAGRAMS Power Box Connectors 66...
Page 67: ...WIRING DIAGRAMS Q AMS Connectors 67...
Page 68: ...WIRING DIAGRAMS I O Controller Connectors 68...
Page 70: ...PARTS LISTING Safety Covers 70...
Page 72: ...PARTS LISTING Bowling Pin Highway 72...
Page 74: ...PARTS LISTING PARTS LISTING 74 Main Components 74...
Page 76: ...PARTS LISTING Frame Assembly 76...
Page 78: ...PARTS LISTING Drawbar Assembly 78...
Page 80: ...PARTS LISTING PARTS LISTING 80 311 1100 00 DC Motor Assembly 80...
Page 82: ...PARTS LISTING PARTS LISTING 82 9122015 Drawbar Shaft assembly 82...
Page 84: ...PARTS LISTING PARTS LISTING 84 9122027 Reel Arm assembly 84...
Page 86: ...PARTS LISTING 9122057 Pulley Detection Assembly 86...
Page 88: ...PARTS LISTING PARTS LISTING 88 9122070 Pin Brake Assembly 88...
Page 90: ...PARTS LISTING PARTS LISTING 90 9122220 Ten Pins Brakes Assembly 90...
Page 92: ...PARTS LISTING PARTS LISTING 92 SB 043 01 Pulley Assembly 92...
Page 94: ...PARTS LISTING 9166005 Table and Stabilization Assembly ME B03 94...
Page 96: ...PARTS LISTING M 0701 25 Rear Ball Lift 96...
Page 98: ...PARTS LISTING 98...
Page 100: ...PARTS LISTING PARTS LISTING 100 SB 0701 30 Rear Ball Lift Assembly 100...
Page 102: ...PARTS LISTING PARTS LISTING 102 SB 0540 75 Pit Cushion Assembly 102...
Page 104: ...PARTS LISTING PARTS LISTING 104 122 3000 00 Ball Rack Assembly 104...
Page 106: ...PARTS LISTING PARTS LISTING 106 133 3000 00 Ball Rack Hood Assembly 106...
Page 108: ...PARTS LISTING PARTS LISTING 108 122 3100 00 Monitors and Supports Assembly 108...
Page 110: ...PARTS LISTING 122 3100 02 LCD Supports Assembly 110...
Page 112: ...PARTS LISTING PARTS LISTING 112 Q100 4500 Masking Unit 112...
Page 114: ...PARTS LISTING Q100 4150 ONE TWO Ball Light 114...
Page 116: ...PARTS LISTING Q100 4156 Stop Go LED 116...
Page 118: ...PARTS LISTING 122 4600 115 Fluorescent Support 115 Vac 118...
Page 120: ...PARTS LISTING 122 4600 220 Fluorescent Support 220 Vac 120...
Page 122: ...PARTS LISTING PARTS LISTING 122 Q200 1010 00 Lateral Safety Guard 122...
Page 124: ...PARTS LISTING PARTS LISTING 124 Electronic Components 124...
Page 126: ...PARTS LISTING PARTS LISTING 126 SB 9802200 230 Power Box 126...
Page 128: ...PARTS LISTING Power Box Front Panel 128...
Page 138: ...PARTS NUMBER INDEX Z Q100 4156 STICKER 117 138...
Page 139: ...INSTALLATION 139 Copyright 2006 QubicaAmf Worldw ide Version 1 3...
Page 144: ...Step by step Chapter Overview Read carefully all the Warnings prior to begin installation 144...
Page 151: ...INSTALLATION 151...
Page 152: ...152...
Page 153: ...INSTALLATION 153...
Page 154: ...154...
Page 155: ...INSTALLATION 155...
Page 156: ...156...
Page 157: ...INSTALLATION 157...
Page 158: ...158...
Page 159: ...INSTALLATION 159...
Page 160: ...160...
Page 161: ...INSTALLATION 161...
Page 162: ...162...
Page 163: ...INSTALLATION 163...
Page 164: ...164...
Page 165: ...INSTALLATION 165...
Page 166: ...166...
Page 167: ...INSTALLATION 167...
Page 168: ...168...
Page 169: ...INSTALLATION 169...
Page 170: ...170...
Page 171: ...INSTALLATION 171...
Page 172: ...172...
Page 173: ...INSTALLATION 173...
Page 174: ...174...
Page 175: ...INSTALLATION 175...
Page 176: ...176...
Page 177: ...INSTALLATION 177...
Page 178: ...178...
Page 179: ...INSTALLATION 179...
Page 180: ...180...
Page 181: ...INSTALLATION 181...
Page 182: ...182...
Page 183: ...INSTALLATION 183...
Page 184: ...184...
Page 185: ...INSTALLATION 185...
Page 186: ...186...
Page 187: ...INSTALLATION 187...
Page 188: ...188...
Page 189: ...INSTALLATION 189...
Page 190: ...190...
Page 191: ...INSTALLATION 191...
Page 192: ...192 Gutter installation Pictures Picture 1 Picture 2...
Page 193: ...INSTALLATION 193 Picture 3 Picture 4...
Page 194: ...194 Picture 5...
Page 195: ...INSTALLATION 195 Picture 6 Picture 7 Picture 8...
Page 196: ...196 Picture 9...
Page 197: ...INSTALLATION 197 Picture 10...
Page 198: ...198 Picture 11 Picture 12...
Page 199: ...INSTALLATION 199 Picture 13...
Page 200: ...200...