First steps
First dreams
Quax
®
www
.quax.eu
41
Commode avec trois tiroirs
Chest of three drawers
SUNNY
54 03 53xx-3D
Commode met drie laden
Kommode mit drei Schubladen
backside of the back and tighten in the profi le. Insert four eccentrics (
D
) into the drillings at the inner front of
the sides. Repeat this procedure with the other drawers. Push the drawer fronts (
7T
,
7M
and
7D
) with their
connectors in the drillings and on the wooden dowels of the drawers and profi les. Tighten the eccentrics.
Push an eccentric into the drilling at the bottom of the drawer supports and tighten.
Step 11 :
Use the parts of step
9
and
10
, the three pairs of drawer runners
ZL
and
ZR
and eightteen bolts
I
Position the sliders (
ZL
and
ZR
) in front of the provided holes of the inner sides (
12
). Push a bolt (
I
) through
the front third hole on the runners and tighten. Now insert the other bolts and tighten them in the sides. Pull
out the drawer slides and place the lower drawer (
7D
) against the stop at the end of the gliders. Push the
drawer over the stop at the front of the slides. Now insert the middle drawer (
7M
) and fi nally the top drawer
(
7T
). Height adjustment of the drawers : adjust the front stop on the slides.
Step 10 :
Use the dra-
wer parts of step
1
and
2
,
three drawer backs
DR3
,
three drawer bottoms
DR4
, twelve wood screws
H
,
three wood screws
G
and fi fteen eccentrics
D
Insert a drawer back
(
DR3
) with the slit fac-
ing inwards between the
sides (
DR2L
and
DR2R
).
Push two wood screws
(
H
) in the provided dril-
lings at the backside of
each side and tighten
them in the back. Slide
the drawer bottom (
DR4
)
into the slots on the sides
and the back. Push a sup-
port profi le (
DR5
) with its
wooden dowels into dril-
lings of the drawer back.
Insert a wood screw (
G
)
into the drilling at the