First steps
First dreams
Quax
®
39
www
.quax.eu
Step 10
: Positioning the drawers
Start with the lowest drawer. Pull out the drawer slides and place the assembled drawer against the stop
at the end of the gliders. Push the drawer over the stop in front of the drawer slides. Repeat these actions
until all drawers are positionned.
Step 9
: Use three drawer-
fronts
E
, twelve connectors
1
, three sides
FL
and
FP
,
twelve eccentrics
2
, three
backs
G
, twelve wooden
dowels
3
, twelve wood
screws
10
,
three bottoms
H
and fi fteen wood screws
7
Fix 4 connectors (
1
) in the
drillings of a front (
E
). In-
sert 4 eccentrics (
2
) in the
holes on the outside of the
sides (
FL
and
FP
). Push 2
wooden dowels (
3
) in the
holes of a back (
G
) and the
sides. Place a drawerback
between the sides and fi x it
by means of the bolts (
10
).
Slide the drawerbottom (
H
)
into the grooves of the as-
sembled drawer and fi x the
bottom to the drawer by
means of the wood screws
(
7
). Push the drawerfront
with its connectors into the
openings of the sides and
fasten it with the eccentrics.
Repeat for all remaining
drawers.
Step 8
: Use the parts of step
7
, the slides
9L
and
9P
and the
twelve wood screws
8
Place 3 left slides (
9L
) on the
drillings of the left side (
AL
)
and tighten with the wood
screws
8
. Use the third hole on
the front of the slides. Repeat
on the right side (
AP
) with the
right slides (
9P
).
STRETTO
54 03 27xxxx
Meuble à Langer avec trois tiroirs
Changing Cabinet with 3 drawers
Luiermeubel met drie laden
Wickelmöbel mit drei Schubladen