First steps
First dreams
Quax
®
First steps
First dreams
Quax
®
www
.quax.eu
31
Step 7 :
Use the parts of step
6
, the drawerbottom
DR4
and four wood screws
F
Slide the drawer bottom (
DR4
) into the grooves of the
assembled drawer and fi x the bottom to the drawer by
means of the wood screws (
F
).
Step 6 :
Use the parts from steps
4
and
5
and four eccentrics
C
Push two eccentrics (
C
) into the provided
openings at the front of each side. Push
the drawer front with its connectors into the
drillings and over the wooden dowels on the
sides and tighten the eccentrics.
Step 8 :
Use the parts of step
2
and
3
and six eccentrics
C
Push the eccentrics (
C
) into
the provided openings at the
underside of the bottom. Turn
a sidepanel on its side. Push
the bottom over the connec-
tors on the side and fasten
with the eccentrics. Push the
other side with its connectors
into the drillings on the bottom
and fasten the eccentrics.
QUARRE
54 05 11xx
Chevet avec tiroir
Bedside table with drawer
Nachttafel met lade
Nachttisch mit Schublade