![Quax MINI MEZZANINE 0101Q00 Series Manual Download Page 23](http://html1.mh-extra.com/html/quax/mini-mezzanine-0101q00-series/mini-mezzanine-0101q00-series_manual_3673100023.webp)
MINI MEZZANINE
0101Q00x
4. Assembling the box
Quax nv
Karel Picquélaan 84 B-9800 Deinze Belgium
T
T
0032 9 380 80 95 www.quax.eu -
E
E
23
Step 4.1
: Use the front
EB1
and six connectors
A
Tighten the connectors (
A
) in the drillings on the
inside of the panel (
EB1
).
The box front is now code
AB1.
Step 4.2
: Use the back
EB3
, two
connectors
A
, four minifi x
B
and
four wooden dowels
C
Tighten the connectors (
A
) in the
drillings at the bottom of the inside
of the panel (
EB3
). Push the minifi x
(
B
) into the holes on the outside of
the back. Push the wooden dowels
(
C
) into the drillings on the sides of
the back.
The back is now code
AB2.
Step 4.3
: Use both sides
EB2-L
and
EB2-R
, eight
connectors
A
, four minifi x
B
and four wooden dow-
els
C
Tighten the connectors
(
A
) in the drillings on the
inside of the sides (
EB2-
L
and
EB2-R
). Push the
minifi x (
B
) into the holes
on an outside of the sides.
Push the wooden dowels
(
C
) into the holes on one
side of the panel.
The sides are now codes
AB3-L
and
AB3-R.