
a
a
PW TECHSAM Woch Sp. J.
tel.
81 444-63-73
ul. Warszawska 131
tel.
81 443-08-12
20-824 Lublin
fax
81 458-38-19
e-mail:
IMPORTER
:
ASSEMBLY INSTRUCTIONS
Waring: During the assembly procedure, nuts and bolts should be hand
tightened only. When assembly is complete, nuts and bolts must be fully
tightened.
1.
Attach two 3
½”
swivel castors (#9) and two 3
”
swivel castors (#10) to
base frame using bolts (#21), nuts (#30) and lock washers (#31).
2.
Referring to the spare parts drawing, insert two legs (#4) into the base
(#1) and lock the legs in place using four locking pins (#5). Secure
these in place using four split-type pins (#7).
3.
Attach the main post (#3) to the base assembly (#1) using bolts (#19),
nuts (#25) and flat washers (#24).
4.
Now secure the boom (#2) to the main post (#3) using bolt (#15), nut
(#23) and flat washer (#24).
5.
Attach support straps (#6) to top of main post using bolt (#16), nut
(#23) and flat washer (#24).
6.
Attach support straps (#6) to the base using bolts (#14), nuts (#23)
and flat washers (#24)
7.
Connect bottom of ram unit (#11) to main post (#3) using bolt (#17),
nut (#23) and flat washer (#24).
8.
While helper holds boom up connect top of hydraulic ram to boom
using bolt (#18), nut (#23) and flat washer (#24).
9.
Slide boom extension (#13) into the main boom (#2), secure in one of
the four positions using bolt (#19), nut (#25) and flat washer (#26).
10.
Tighten all nuts and bolts.