Page 5
© Quatro Air Technologies| JULY 2019 | All rights reserved |
Jet-Stream Tall Operation & Maintenance Manual
Pre-Startup Checklist
WARNING:
All filters must be in place before operating the system.
Pre-Startup Checklist
1 . Position the unit in the chosen location .
2 . Filters are already supplied in place . See
"Filter Service and Replacement"
on page 17 for more info on replacing in
the right order .
3 . Connect the supplied hose (or optional arm) to the Jet-Stream .
Startup
REMINDER: Ensure to use proper voltage and sufficient amperage as indicated on the system before powering
up the unit.
ONLY USE THE POWER CORD SUPPLIED WITH THE EQUIPMENT .
Always plug the unit directly into the wall outlet . Do not use extension cords or power bars . Ideally the unit should be
plugged into it’s own dedicated circuit .
1 . Connect the power cord to the unit and then to the power source .
2 . Turn the Jet-Stream System On .
The system does not need to be on all the time nor does it need a warm up period. It can be turned on and off as
needed .
Your Jet-Stream should now be functioning and operational;
3 . Use the SPD UP and SPD DN controls to adjust to desired airflow. If noise and suction are acceptable operate at max
speed for maximum removal .
NOTE:
The filters in this system are not cleanable. They need to be removed and disposed of periodically.
See
"Specifications" on page 23
and
"Filter Service and Replacement" on page 17
.