
1
Setup Notes
DynaLAL III Low Air Loss Alternating
Pressure Mattress
Unpack the mattress and control unit (pump). If you are using it for a client demo, be sure to keep the boxes and
mattress bag just in case you need to send the mattress back to Quart Vancouver or Quart Toronto.
•
Wipe down bed frame before placing mattress onto the bed deck. Place mattress on deck, arranging so that
air supply tubes are at the foot of the bed.
•
Secure the mattress to the bed frame with ties (black webbing) located on the underside of the mattress. Ties
at the head of the bed should be snug. Ties located toward the middle section and foot of the mattress should
be less snug, allowing the mattress to move as needed when the head or foot of the bed is raised/lowered.
•
Place control unit onto the frame of the bed (foot end) using handles attached to the back of the control unit.
•
Connect air hose, exhaust hose, and electronic sensor cable to control unit.
The air supply hoses (grey connector) must plug into the controller with the
two plug indentations lining up with the matching ridges on the control unit
socket.
•
Unzip cover and check to ensure all bladders (air cells) are connected to
feeder tubes. Ensure no hoses are kinked. Zip the cover back up, ensuring
zippers are all completely closed.
•
Plug control unit into power outlet. Ensure the power cable is fed through
loops along one side of the mattress to avoid becoming a tripping hazard.
•
The STANDBY LED will illuminate when control unit is plugged into electrical
outlet.
•
Press the
STANDBY/OPERATE
button on the front panel (OPERATE LED will now be illuminated and the
control unit will be in operation)