Chapter 1 Installing the ValueLoader
Connecting the SCSI and Power Cables
12
ValueLoader DLT VS80/DLT VS160 Tape Autoloader User Manual
4
Slide the ValueLoader onto the rails and secure the mounting bracket
to the rack using the screws and clip nuts from the rackmount
hardware package, as shown in
Figure 7 Sliding the
ValueLoader into the
Rack Slot, Securing
Mounting Bracket
Connecting the SCSI and Power Cables
1
To connect the SCSI and power cables to the ValueLoader, follow these
steps:
1
Shut down and turn off the selected server. Turn off all attached
accessory devices, such as printers and other SCSI devices. Remove
the power cables from the server and all attached accessories.
Caution:
Failure to remove the power cables from these devices
could result in damage to the ValueLoader.
Summary of Contents for ValueLoader DLT VS160
Page 1: ...ValueLoader DLT VS80 DLT VS160 Tape Autoloader User Manual 6326704 02 A01...
Page 6: ...vi ValueLoader DLT VS80 DLT VS160 Tape Autoloader User Manual...
Page 8: ...Figures viii ValueLoader DLT VS80 DLT VS160 Tape Autoloader User Manual...
Page 10: ...Tables x ValueLoader DLT VS80 DLT VS160 Tape Autoloader User Manual...
Page 84: ...Manufacturer Declaration 70 ValueLoader VS80 VS160 Tape Autoloader User Manual...
Page 88: ...74 ValueLoader DLT VS80 DLT VS160 Tape Autoloader User Manual...