Chapter 3: Basic System Operations
Powering On a Single MDC Node of the StorNext M330
StorNext M330 Metadata Appliance Hardware Guide
35
Powering On a Single MDC Node of the StorNext
M330
To turn on power to the system:
1
Push the power switch on the front of the MDC node currently
operating as
secondary
(see
Figure 16 Turning On Single
MDC Node Power
2
Perform a system failover (see
Initiating a Graceful System Failover
on page 48), if you desire to set the system back to the state it was
in prior to the shut down for the FRU/CRU replacement.
Shutting Down a Single MDC Node of the StorNext
M330
To shut down a single MDC node: