Scalar i2000 Installation Guide
265
6
Carefully align the blade with the guide slots in the bay. The status LEDs must be at the top.
7
Use your thumbs on each end of the blade to
on page 234 evenly apply pressure and slide it
into the I/O management unit. When you feel the pins of the blade lock into the backplane, push the
latchhooks towards the middle of the blade and into the lock position.
8
Remove and discard the plastic covers from the Ethernet connector on the tape drives.
9
Remove and discard the protective covers from the ports on the Ethernet Expansion blades.
10
Carefully unwrap the EEB cables and remove the two plastic protective caps from each end of the cable.
CAUTION
Forcing the blade into the bay can cause the pins to bend.
CAUTION
Slots that are not populated with blades must contain a cover plate. If
the cover plates are not installed, blade temperature errors will occur.
Ethernet Expansion blades installed
status LEDs
in bays 7 and 8
Summary of Contents for Scalar i6000
Page 20: ...8 About This Guide and Your Product...
Page 38: ...26 Installing a Stand Alone Control Module...
Page 104: ...92 Installing a Multi Module Library...
Page 156: ...144 Installing Cartridges...
Page 164: ...152 Setting up Your Library for Access...
Page 242: ...230 Configuring the Library...
Page 304: ...292 Adding Optional Hardware eight 2 5 mm screws...
Page 318: ...306 Adding Optional Hardware...
Page 336: ...324 Installation Testing and Verification Figure 35 Example Test Log Output...
Page 356: ...344 Testing and Calibrating the Digital Level...
Page 362: ...350 LBX Board and Terminator...
Page 380: ...368 Glossary...
Page 384: ...372 Index...