168 QXS G2 Hardware Installation and Maintenance Guide
shows a pictorial view of a 2U12 chassis. The bezel attaches to the chassis face labeled
“Front.” The bezel installation process is the same for the 2U12 and 2U24 chassis.
Figure 127
Orientation Key
1
Identify the chassis to which the bezel will be attached.
shows a 2U12 chassis — with ears exposed — that is ready for bezel installation.
2
Open the box containing the bezel, and swing the lid back to reveal the bezel assembly packaged
in foam. Remove the contents.
Figure 128
Bezel Assembly
NOTE:
Once you have removed the bezel assembly from its foam-packed box, examine it carefully,
to verify that it is properly configured (with or without an air filter) to address your site requirements.
1
Front
2
Back
3
Left
4
Right
1
2
3
4
Summary of Contents for QXS G2 Series
Page 1: ...QXS G2 Hardware Installation and Maintenance Guide 12 24 and 84 Drive Systems 6 68649 01 Rev A...
Page 126: ...114 QXS G2 Hardware Installation and Maintenance Guide...
Page 176: ...164 QXS G2 Hardware Installation and Maintenance Guide...
Page 232: ...220 QXS G2 Hardware Installation and Maintenance Guide...
Page 236: ...224 QXS G2 Hardware Installation and Maintenance Guide...
Page 246: ...234 QXS G2 Hardware Installation and Maintenance Guide...