Chapter 9: Configuration
Scheduler
Quantum DXi6900 User’s Guide
282
Edit an Existing Event
l
To edit an existing event, double-click the event. If the event is recurring, select
Open this
occurrence
to edit only the one instance of the event, or select
Open the series
to edit the
entire recurring series, and then click
OK
.
l
You cannot edit an event that occurred in the past.
l
You can also right-click an existing event to see options for editing an event.
Figure 175:
Adding a New Event
2. Define the start and, if applicable, the end of the event.
l
Specify the
Start Date
and
Start Time
using the pop-up calendar and drop-down box.
l
(Replication throttle events only) Specify the
End Date
and
End Time
. The end date and time must
occur after the start date and time.
Note:
For a new event, you can click and drag to adjust the start and end time. For an existing
event, you can drag the event to change when it occurs. You can also drag the left or right edge of
the event to adjust the start or end time.
3. Enter a brief description of the event in the
Description
box. (This description will display on the
schedule view.)
4. Specify options specific to the type of event. See the following sections:
l
Scheduling a Share or Partition for Replication on the next page
l
Scheduling Replication Throttling on page 284
l