XLS Library Site Planning Guide
3-1
3
Installing the Library
Ensure that the proposed installation location meets the requirements for the following:
•
Floor space, floor loading, and service access requirements. See
.
•
Environmental specifications. See
.
•
Power. See
.
•
Cooling. See
.
3.1
Floor Space and Floor Loading
This section lists the floor space, floor loading, and service access requirements for the
following hardware:
•
XLS-810160 or XLS-810240, including an expansion pod. See
•
XLS-85000 Media Expansion Module (MEM2). See
Before moving the XLS to its final destination, ensure that there is adequate floor space
available and that the floor is capable of holding the equipment’s weight.
Important:
Be sure to leave adequate space behind the library and any
attached MEMs to allow for service access to the following
components:
• PC bay (includes the power switch and connector, system
controller components, and cooling fans)
• Tape drives
• Power supplies
• Battery module
When extended, the PC bay requires 12 inches (31 cm) of
space.
Summary of Contents for XLS-810160
Page 1: ...XLS 810160 XLS 810240 Tape Libraries Site Planning Guide Document No 501804 Rev 07 01 19...
Page 6: ...Table of Contents vi 501804 Rev 07 01 19 Notes...
Page 10: ...1 1 About the XLS 1 4 501804 Rev 07 01 19 Figure 1 3 LRM with one MEM2...
Page 22: ...3 4 Cooling Requirements 3 10 501804 Rev 07 01 19 Notes...