3.2 Installation
Once the machine has been unpacked, the following steps should be performed:
•
Check that the electricity supply voltage is the same as that listed on the
specification plate and in the machine’s documentation.
•
Connect the dispenser plug to the appropriate
connection base according to the current
electrical standards of the area.
3
•
Press the main power switch.
- At this moment the boiler will be automatically filled
with water, process that is indicated by the led located
next to the main power switch.
Once the filling process has finished, the indicator will
turn off and the boiler heating cycle will start. This
process lasts for approximately 15 minutes, and at
this moment the steam tap should be closed.
After this time and with pressure Reading of
approximately 1.3 bars on the gauge, the machine is
ready to work.
4
It is recommended to use water with a hardness
between 5-8 dHº (8-14 fHº) to avoid calcification
and to obtain an optimal quality of the product.
i
Main switch
•
Connect the output of the water softener to the
machine’s water input (3).
•
Supply water by opening the stopcock (1).
2
2
4
1
2
1
Water level LED
indicator
•
Place the machine on the workbench, and
connect the water supply tube from the stopcock
(1) to the water softener (2).
•
Drain the output of the water softener into a
bucket, until the water flows clean.
1
You should not use extension cords or outlet
adapters of any kind to connect the machine to the
electricity network.
The network connection cable should never be rolled
up; instead, it should be fully extended to avoid
possible overheating.
i
If an adequate water level is not detected in the boiler
within a certain time, the water level LED indicator
(next to the main power switch) will blink, indicating a
water level warning. This warning can be cancelled by
turning the machine off and on again.
i
•
Open the steam tap.