![Quality Espresso Ruby Pro 2 User Manual Download Page 8](http://html1.mh-extra.com/html/quality-espresso/ruby-pro-2/ruby-pro-2_user-manual_3410891008.webp)
6
Lead the drainage tube through the opening at the base
of the machine and connect the tube to the fitting. Then,
lead the end of the tube to the drain.
Connect the drainage tube to the machine
It is important that the drainage tube is
completely straight with no angles in order to
facilitate good drainage.
i
3
Press the main power switch.
At start-up the electronic control box detects that
there is no water in the boiler and activates the
filling valve and the pump. These remain active until
the level probe detects adequate water level. As
soon as this occurs, the boiler element will switch
on, heating the entire system.
5
If the control box does not detect an adequate
water level in the boiler within 6 minutes, the one-
coffee and two-coffee LED keys plus the level
indicator LED will blink, indicating a water level
warning. This warning can be cancelled by turning
the machine off and on again.
i
You should not use extension cords or outlet
adapters of any kind to connect the machine to
the electricity network.
The network connection cable, should never be
rolled up; instead, it should be fully extended to
the avoid possible overheating.
.
i
Connect the machine plug to the appropriate socket
according to the current electrical standards of the
area.
4
Place the filter holder in the group head, press the
continuous coffee button to purge the group, let
water flow for 30 seconds. Then wait approximalety
15 minutes until the machine is at normal working
temperature, observing whether the gauge indicates
a pressure of 1 bar.
6
While the machine is heating, proceed with the
installation of the grinder. Adjust the grinding point
and doses.
7
Once the machine has reached working temperature
and we have adjusted the grinder, we can program
the coffee doses (see section 3.3, pg. 7)
8