Transformer Elevation Evaluation  

Large  terrain  variations  can  also  lead  to  reduced  signal  strength  due  to  earth  obstructions.  The  elevation  of 
each transformer should be noted with any variations of hills or other land masses between the transformers 
noted. This can again be accomplished with a web-based tool lik

https://en-us.topographic-map.com/

, which 

provides free topographical maps, or site surveying or site maps as available.  

Line of Sight 

– Obstruction Evaluation 

Large  vegetation,  urban  development  or  other  physical  structures  can  lead  to  reduced  signal  strength  and 
range. Note any obstructions that would prevent line of sight and obstructions between transformers. 

Cell Coverage Evaluation   

For USA (United States Americas) installs, the QGateway uses the Verizon network on band 13. For Canadian 
installations,  the  QGateway  uses  the  Bell  network  on  bands  5,  and  13.  Using  a  web-based  tool  like 

www.cellmapper.net

 can assist in determining the location of nearby tower(s) and the band(s) that those towers 

operate.  

The  direction  of  the  tower  to  the  transformer  is  also  important  to  note  for  QGateway  placement  to  optimize 
antenna direction and minimize obstructions.  

QGateway Quantity and Location. 

 The QGateway must have solar access when installed to ensure recharging of the system batteries. If there 
are areas of heavy shading and vegetation growth, make sure to note these during site survey and avoid these 
areas for QGateway installation. It is more favorable to place the QGateway away from interference sources 
such as inverters and as high above ground level as possible.  

Use the following rules of thumb to help determine quantity of QGateways needed for installation.  

Calculate adjusted max range: 

Adjusted Max Range = QGateway Range X Obstruction Rating

 

 

IF  (Closest  Distance  Between  Two  Transformers)  >  (Adjusted  Max  Range

)  use  a  1:1  QGateway  to 

DGA-LT1 ratio 

 

IF (Distance between farthest two transformers) < (Adjusted Max Range)

 use 1 QGateway for DGA-

LT1 quantities of 1-10, 2 QGateways for DGA-LT1 quantities of 11-20, etc.  

 

IF (Distance between farthest two transformers) > (Adjusted Max Range): 

 

Approximate Number of QGateways =

 

𝑅𝑂𝑈𝑁𝐷 𝑈𝑃 (

𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝑓𝑎𝑟𝑡ℎ𝑒𝑠𝑡 𝑡𝑤𝑜 𝑡𝑟𝑎𝑛𝑠𝑓𝑜𝑟𝑚𝑒𝑟𝑠

𝐴𝑑𝑗𝑢𝑠𝑡𝑒𝑑 𝑀𝑎𝑥 𝑅𝑎𝑛𝑔𝑒

)

 

Example: 

 

Distance between the farthest 2 transformers is 600m (about 2,000 ft) 

 

Adjusted Max Range is 500m (about 1,700 ft) 

 

Approximate Number of QGateways = ROUND UP (1.2) = 2 

Summary of Contents for DGALT1-11120

Page 1: ...allation User Guide www qualitrolcorp com QualConnex On Line Transformer Monitor Installation User Guide DGALT1 11120 DGA LT1 GTW RF 3311 QGateway USA GTW RF 3311 CA QGateway Canada Version 2 0 July 2...

Page 2: ...laims any responsibility or liability for any direct or indirect damage resulting from the use of the information in this manual or products described in it The mention of any product or brand does no...

Page 3: ...6 Verify DGA LT1 Clearance and Drain size 6 Transformer Selection 7 Transformer Configuration 7 Transformer Distance Evaluation 7 Transformer Elevation Evaluation 8 Line of Sight Obstruction Evaluatio...

Page 4: ...Positioning 23 Power on and Confirm QGateway Cell Signal 25 Notes for troubleshooting 26 Installing DGA LT1 Monitor 26 DGA LT1 Installation check list 26 DGA LT1 Installation steps 27 Bleeding the DGA...

Page 5: ...gas is formed under all known thermal fault conditions in oil filled transformers it is commonly referred to as the universal fault gas In addition Hydrogen is one of the first gases to be generated...

Page 6: ...ration ppm oil moisture concentration RH and oil temperature C levels over time and compare against user defined alarm settings The web interface displays QGateway reports including battery level and...

Page 7: ...ity 5 or 50 ppm Oil Temperature Range 40 F to 220 F 40o C to 105o C Temperature Accuracy 5 or 2 C accuracy 4 F Moisture Measurement Range 0 to 100 RH non condensing Moisture Measurement Accuracy 5 RH...

Page 8: ...s must be confirmed to ensure the best performance for your system These steps will confirm that the DGA LT1 will fit the equipment to be monitored and identify the number and placements of the QGatew...

Page 9: ...be installed if the equipment is under vacuum conditions Transformer Selection The QualConnex system uses cellular connection to transmit data from the QGateway to the cloud To achieve this there mus...

Page 10: ...the tower to the transformer is also important to note for QGateway placement to optimize antenna direction and minimize obstructions QGateway Quantity and Location The QGateway must have solar acces...

Page 11: ...culations the following table can help record and scale the required number of QGateways Measured Value Quantity Notes Number of Transformers to be monitored with DGA LT1s Closest Distance between 2 t...

Page 12: ...____________________________ Transformer name _____________________________________________________________ DGA LT1 serial ________________________________________________________________ Transformer...

Page 13: ...g the QGateway with mount QGateway field installation Installing the DGA LT1 Bleeding the DGA LT1 monitor Commissioning Items Shipped Upon receipt of your transformer monitor it is important to verify...

Page 14: ...rogen Concentration Moisture Concentration and Oil Temperature 1 Connection RF Bleed Tube Tubing for bleeding air from DGA LT1 after installation GTW RF 23310 Qualitrol QGateway Wireless Sensor Transc...

Page 15: ...mer Details to Prepare for Installation list the website should be configured prior to site installation This will enable verification of the DGA LT1 and QGateway while in the field and will only requ...

Page 16: ...ed and not connected to the magnetic mount This enables field configuration to optimize performance The following sections will detail how to determine the optimal angle for the magnetic base assemble...

Page 17: ...Installation User Guide Table 1 QGateway Mount Configuration Installation Surface Installation Angle from horizon Picture Mounting Hardware Configuration Horizontal 30 Horizontal 45 Horizontal 60...

Page 18: ...Installation User Guide Installation Surface Installation Angle from horizon Picture Mounting Hardware Configuration Vertical 30 Vertical 45 Vertical 60...

Page 19: ...ing 2 flange head screws as shown in Figure 3 2 Do not fully tighten the screws Figure 2 Magnetic mount components shipped From left to right 1 adjustable magnetic base 2 support struts 6 flange head...

Page 20: ...trut with the desired mounting hole per the configuration chosen as shown in Table 1 5 Secure both support struts using 2 flange head screws as shown in Figure 5 6 Once the supports are in the desired...

Page 21: ...of the QGateway facing the hinge of the adjustable magnet mount See Figure 6 Figure 7 Figure 6 QGateway mounting surface Figure 7 Front of QGateway facing the same direction as the adjustable mount hi...

Page 22: ...hipment The antenna must be attached and configured during site installation Screw the antenna in the clockwise direction onto the SMA connector present on the outside of QGateway While installing ens...

Page 23: ...Installation User Guide Figure 10 LoRa antenna and SMA connector Figure 11 Screw on LoRa antenna using knurled thumb screw...

Page 24: ...izontal configuration example top of a transformer or vertical configuration example wind turbine nacelle Other magnetic surfaces can also be used if there is sufficient surface area 10 W x 4 H 25 5 c...

Page 25: ...detach the QGateway from a magnetic surface by pulling straight up from the mounting surface The rolling method described above is required The cumulative magnetic force of the mount is 165lbs 75 kg...

Page 26: ...Installation User Guide Figure 14 Securely holding QGateway Figure 15 Rolling the magnet mount onto the magnetic surface...

Page 27: ...e the QGateway is powered on and has cellular signal 1 Depress the power button to turn on the QGateway 2 Wait 3 minutes for the QGateway system to activate 3 Press and hold the status button 4 Confir...

Page 28: ...e unit 4 6 hours in sunlight to charge to an operational level and check again If the red LED remains illuminated please contact Qualitrol for help The unit can be slowly charged under incandescent li...

Page 29: ...flon tape 0 0032 or 0 08 mm thick and a thin layer of PTFE pipe thread sealant 5 Thread the DGA LT1 sensor into the transformer drain valve starting the threads by hand 6 Tighten the monitor with a 1...

Page 30: ...is a suggested procedure that provides a visual reference indicating bleeding of the system Other methods can be employed but vacuum e g pump or syringe should not be used to pull oil through the sens...

Page 31: ...er drain valve is fully open and check for leaks Confirm Communication Login to the QualConnex website and confirm that data has been received to the associated transformer linked sensor See QualConne...

Page 32: ...y oil and sealant residue Regulatory Information United States FCC Caution Changes or modifications not expressly approved by the party responsible for compliance could void the user s authority to op...

Page 33: ...L metteur r cepteur exempt de licence contenu dans le pr sent appareil est conforme aux CNR d Innovation Sciences et D veloppement conomique Canada applicables aux appareils radio exempts de licence L...

Reviews: