QualGear QG-DB-003-BLK Installation Manual Download Page 4

5

6

Mounting to a Concrete Wall

1b

Hold the marking template (F) provided against the wall where you want to install your AV 

 

equipment, mark six holes for drilling.

1

F

Marking Template

6

WARNING

 

Installers must verify that the supporting surface will safely support the combined

  weight of the equipment and all attached hardware and components.

NOTE

Do NOT use power drill and do NOT over tighten the lag bolts.

P-A

P-B

C

Wall Plate

QG-DB-003-BLK

Using a power drill and a 5/16" masonry drill bit, drill mounting holes of 5/16" (8 mm) diameter 
and 2.2" (55 mm) depth at the marked locations in the previous step.

2

ø 8mm

 

(ø 5/16") 

55mm

(2.2")  

(2.2")

55mm

3

Place concrete anchors (P-B) in each hole.  Tap each anchor flush with the wall using a hammer.
Using a proper Phillips screwdriver, mount the wall plate (C) and fasten them with the provided 

lag bolts (P-A). 

Reviews: