STEP 1
•
The base station can be located in
either the OR or the monitoring room.
•
Identify a location with clear space
around it and nothing in front (the base is
a transmitter).
(figure 1)
•
You need a 230/240v power socket
close by. Connect the Q-PSU48 power
supply into the wall socket and then into
the socket in the top of the base.
•
The base should be fitted to the wall
using the two velcro strips supplied,
peeling back the protective covers. Do
not fit the base to the wall upside down or
sideways.
•
When the power is connected, the LED
on the front will start AMBER during booting
up, then go GREEN after 30 secs.
STEP 2
•
Set up the 6-port battery charger.
Select a clear desk or cabinet top in the
monitoring room close to a 230/240v
power socket that DOESN’T get switched
off or unplugged at night.
(figure 2)
•
Connect the Q-PSU5 power supply into
the back of the charger and weave the
cable around the gates.
(figure 3)
•
Switch on the power. The LED on the
front of the charger will illuminate GREEN.
figure 2
figure 3
figure 1