background image

STEP 1

 The base station can be located in 

either the OR or the monitoring room.

 Identify a location with clear space 

around it and nothing in front (the base is 
a transmitter). 

(figure 1)

 You need a 230/240v power socket 

close by. Connect the Q-PSU48 power 
supply into the wall socket and then into 
the socket in the top of the base.

 The base should be fitted to the wall 

using the two velcro strips supplied, 
peeling back the protective covers. Do 
not fit the base to the wall upside down or 
sideways.

 When the power is connected, the LED 

on the front will start AMBER during booting 
up, then go GREEN after 30 secs.

STEP 2

 Set up the 6-port battery charger. 

Select a clear desk or cabinet top in the 
monitoring room close to a 230/240v 
power socket that DOESN’T get switched 
off or unplugged at night. 

(figure 2)

 Connect the Q-PSU5 power supply into 

the back of the charger and weave the 
cable around the gates. 

(figure 3)

 Switch on the power. The LED on the 

front of the charger will illuminate GREEN.

figure 2

figure 3

figure 1

Reviews: