13
Quadra-Fire • QV36DB • 2017-900 Rev. C • 5/05
Figure 5.
Vent System Components and Termination Kits
Step 3. Installing the Vent System
A. Vent System Approvals
This model is approved to use DVP-series direct vent pipe
components and terminations (see Figures 4 and 5). Ap-
proved vent system components are labeled for identifica-
tion. This pipe is tested and listed as an approved compo-
nent of the fireplace. The pipe is tested to be run inside an
enclosed wall. There is no requirement for inspection open-
ings at each joint within the wall. There is no required pitch
for horizontal vent runs.
NO OTHER VENTING SYSTEMS
OR COMPONENTS MAY BE USED
.
Detailed installation instructions are included with each
vent termination kit and should be used in conjunction
with this
Installers Guide
. The flame and ember appear-
ance may vary based on the type of fuel burned and the
venting configuration used.
Identifying Vent Components
The vent systems installed on this gas fireplace may in-
clude one, two, or three 90°
elbow assemblies. The rela-
tionships of vertical rise to horizontal run in vent configura-
tions using 90° elbows
MUST BE
strictly adhered to. The
rise to run relationships are shown in the venting drawings
and tables. Refer to the diagrams on the next several pages.
NOTE: Two 45° elbows may be used in place of one
90° elbow. Rise to run ratios in the vent system must
be followed if 45° elbows are used.
This model has vent starting collars on both the top and the
back of the unit. Depending upon the installation, decide
which
ONE
set of starting collars will be used to attach the
vent system. The starting collar sealing cap must re-
main on the starting collar
NOT
used.
HORIZONTAL
TERMINATION
WALL FIRESTOP
90 DEGREE
ELBOW
PIPE LENGTH
CEILING
FIRESTOP
VERTICAL
TERMINATION
STORM COLLAR
ROOF FLASHING
(Required to have a minimum of 3
feet of vertical in the vent system)
DVP-TVHW
DVP-TRAP
DVP-TB1
Terminations Kits