
Hearth & Home Technologies - Colville
1445 North Highway, Colville, WA 99114-2124
VILLAGE COLLECTION ELECTRIC FIREPLACE
5
09/03
4030-240 Rev F
Figure 2 shows a typical framing of this appliance using combustible materials. All required clearances to combustibles must be
adhered to. Header height is measured from the base of the appliance.
D. FRAMING
Figure 2 - Framing
CAUTION:
Provide adequate clearances around the air openings
and adequate accessibility clearances for servicing and
proper operation.
Tools and building supplies normally required for
installation:
Tools:
Building Supplies:
Saw
Wall-finishing materials
Pliers
Framing material
Hammer
Surround
Phillips screwdriver
Caulking material
Tape measure
Level
Electric drill/bits
Square
Gloves