Page 24
7033-277N
August 3, 2015
R
3100 Wood Stove Series (ACC)
Do
NOT
tilt the unit on the cast iron legs.
•
Tilting could lead to property damage.
•
Lift the unit upright and place it into position on the fl oor
protector.
CAUTION
Lay stove flat on its
back on protective
padding or pallet
Insert 2 bottom
screws loosely
Ash Drawer
Leg Brackets
Figure 24.1
Figure 24.2
Leg Mounting Brackets are
packaged inside firebox.
Leveling Legs at
opposite corners
Finishing the ARS Installation
1. Follow steps 1 through 3
on
page 22.
See also
Figure
22.2.
C. Door Handle Assembly
1. Install washer on door handle shaft.
2. Slide door handle through door.
3. Install second washer(s) as shown.
4. Install key in groove.
5. Align groove in latch cam with key; slide latch cam over
shaft
6. Install locknut but do not overtighten as the door
handle needs to move smoothly.
7. Install spring handle turning in a counter-clockwise
motion to desired location on door handle rod.
Figure 24.3
Locknut
Door Cross Section
Latch Cam
Spacing Washers
Square Key
Door Handle
Spring Handle
CAUTION
• Do NOT overtighten lock nut.
• Door handle needs to move smoothly.
D. Decorative Tile Installation (31M-ACC-LE)
1. Remove tile frame from side by lifting up and pulling away
from stove.
Figure 25.1
2. Stack tiles in tile frame as shown in
Figure 25.2.
3. Reattach tile frame.
Tile Dimensional Requirements:
Max Thickness: 5/16”
Max Length/Width: 11-7/8” square
Min Length/Width: 11-11/16” square