background image

Franking Machine

Base Swap Guide

IS-280

Summary of Contents for IS-280

Page 1: ...Franking Machine Base Swap Guide IS 280...

Page 2: ...Table of Contents Swap mailing system base unit 1 1 Base swap process 1 Page 1 TOC Jun 16 2015 01 33...

Page 3: ...Page 2 TOC Jun 16 2015 01 33...

Page 4: ...ble to use the MENU button on the faulty base please remove your ink cartridge using the following path This cartridge will be refitted to the new base during the installation process 1 Press the MENU...

Page 5: ...Remove other cables from the rear of the base 5 Lift the weight platform off of the base and remove the cable Store the platform in a safe place it will be reconnected at the end of the process 2 Page...

Page 6: ...lace The meter will be refitted during the swap process Close the meter cover and place the faulty base to one side 8 Remove the new base unit from the box Open the front cover as shown in the diagram...

Page 7: ...10 Turn the unit back to the upright position Refit the weight platform by connecting the plug as shown and placing the platform back on top of the base unit 11 If you use LAN Reconnect the LAN to the...

Page 8: ...as shown in the following diagram To Run PC Meter Link application please see more details in the Installation Guide Plug to the USB cable square end to your system Plug the USB cable flat end to your...

Page 9: ...ers up a message with an error code may appear This is due to the base Looking for the ink cartridge To skip this screen Press If you use Telephone modem Reconnect the Telephone modem to the USB port...

Page 10: ...s selected the unit will test the connection for any security proxy settings If a proxy server is detected the network administrator will be required to obtain the settings for connection to the Neopo...

Page 11: ...continue the process press 1 2 Before pressing OK check that the Telephone modem is connected from the base to the telephone socket then press 3 Select the connection type 8 Page 8 Jun 16 2015 01 33 S...

Page 12: ...prefix if required 5 Enter the required prefix then press OK Setting up connection with LAN How to Use LAN connection To continue the process press 1 1 9 Page 9 Jun 16 2015 01 33 Swap mailing system b...

Page 13: ...Before pressing OK check that the LAN is connected from the base to the LAN socket then press 3 Select the LAN connection 4 To continue press 10 Page 10 Jun 16 2015 01 33 Swap mailing system base unit...

Page 14: ...selecting this connection type Please refer to Installation Guide How to Use PC Meter Link Connection To continue the process press 1 2 Before pressing OK check that the USB cable is connected from t...

Page 15: ...3 Select PC Meter Link connection 4 To continue press 12 Page 12 Jun 16 2015 01 33 Swap mailing system base unit 1...

Page 16: ...ction is checked the following screens will be displayed A connection to the Neopost system must be completed to finish the swap process To continue press OK 1 2 Wait for the system to connect to the...

Page 17: ...a test imprint to align the print head You will require a plain envelope to complete the test Follow the next instructions to complete this process 4 To continue press 5 The following screen appears D...

Page 18: ...the left side of the blue lever to the open position Fit the ink cartridge and then click the blue lever back to the closed position as shown below 7 Close the front cover then press To continue press...

Page 19: ...several times to align the head correctly 9 Continue the test until F is the straightest Line When the process is finished press 10 The swap process is now complete Press Please power the unit off the...

Page 20: ...I installation 1 Installation 11 L LAN 7 P PC Meter Link 7 11 T telephone 7 Index Page 17 Index...

Page 21: ...Index Page 18 Jun 16 2015 01 33 A0048756 C 27 01 2020...

Page 22: ...A0048756 C 27 01 2020...