![background image](http://html1.mh-extra.com/html/quad/ez-7000/ez-7000_owners-and-installation-manual_768583010.webp)
- 10 -
Step Two-Mounting Operator-Controller
•
Move square nuts provided in header slots to pre-marked positions.
•
Lift unit into header and secure with the 4 bolts provided making sure output shaft is at center of
opening.
WARNING:
The closing speed control is built into the Controller.
DO NOT
wind or rotate the motor until
the Controller is installed and plugged in or serious damage could be inflicted on the Controller as well as the
installer.
•
Install the Hold-Open-Automatic (HOA) switch into the end cap hole provided on each end and
plug in wiring harness from switch and operator into marked pins.
WARNING: Do NOT connect opener to source of power until instructed to do so.
NOTE:
At this point do
not
install any other device into the controller i.e., switch harness lock
harness, safety harness, radio harness, etc…
Step Three-Mounting the Arm, Rod and Rod Swivel
•
Install Rod Swivel as shown below using dimension chart below.
Summary of Contents for EZ-7000
Page 2: ... 2 ...
Page 4: ... 4 ...
Page 7: ... 7 ...
Page 8: ... 8 ...
Page 11: ... 11 Installing Power Arm and Rod Prepare Power Arm and Rod as per drawings and charts ...
Page 12: ... 12 ...
Page 19: ... 19 ...
Page 20: ... 20 ...
Page 21: ... 21 Lock with No Transformer not recommended Lock with Transformer recommended ...
Page 22: ... 22 ...
Page 23: ... 23 BEA Technical Support East Region 866 836 1863 West Region 888 419 2564 ...
Page 24: ... 24 Optex Technical Support 800 966 7839 ...
Page 25: ... 25 Optex Technical Support 800 966 7839 904C ...
Page 28: ... 28 ...