![QTech QSW-6200-32F Hardware Installation And Reference Manual Download Page 39](http://html1.mh-extra.com/html/qtech/qsw-6200-32f/qsw-6200-32f_hardware-installation-and-reference-manual_768117039.webp)
QSW-6200
Series Switch Hardware Installation and Reference Guide
39
www.qtech.ru
After choosing the series port, click
OK
to display the series port parameter setting page, set the baud rate at 9600, data
bit at 8, parity check as none, stop bit at 1 and flow control as none.
Figure 4-4
After setting the parameters, click
OK
to enter the super terminal page.
4.2 Power-on Startup
Checking before Power-on
The switch is fully grounded.
The power cable is correctly connected.
The power cable is buckled after connected.
The power supply voltage complies with the requirement of the switch.
The console cable is correctly connected; the terminal (can be a PC) used for configuration is already started; the
parameters are already configured.
Checking after Power-on (Recommended)
After power-on, you are recommended to perform the following checks to ensure the normal operation of
follow-up configurations.