163
Copyright@2004~2014 Qsan Technology, Inc. All Rights Reserved.
Qsan Document – User Manual
MC/S
To setup MC/S (Multiple Connections per Session) of the replication task path, please follow the
procedures.
1.
In
QReplicas
tab of the source side, select the task path, and then click
▼
-> Add Connection
.
2.
Select the
Source Port
and input the
Target IP
, and then click
OK
button.
3.
The connection is added.
To delete multi connections per session of the replication task path, please follow the procedures.
1.
In
QReplicas
tab of the source side, select the task path, and then click
▼
-> Delete
Connection
.
2.
Select the connection(s) which want to be deleted, and then click
OK
button.
3.
The multi connection(s) are deleted.
Task Shaping
If the replication traffic affects the normal usage, we provide a method to limit it. There are eight
shaping groups which can be set. In each shaping group, we also provide peak and off-peak time
slot for different bandwidth. The following take an example of setting shaping group.
1.
In
QReplicas
tab of the source side, click
Shaping Setting Configuration
button.