background image

 

  

 

  

 

 

 Qonnex 

18 

Quick start 2-Wire v3.0 

1.

 

Enter 

unique fictitious

 

 serial number starting with 03E followed 

by a unique number with 5 digits: Vb..

 

03E00002 

2.

 

Give a name to the meter: Vb.. 

EMM.630CT 

 

and press

 

 "NEW" 

3.

 

A table appears with 3 rows, 1 row per stage. Give a recognizable 
name to the each stage exit: Vb.. 

 Phase 1, Phase 2, Phase 3 

 

4.

 

Choose mode

 COUNTER

(automatic)

 

5.

 

Enter the Modbus address of the module: Vb.. 1

 

(AND NOT 

 

017!!)

 

6.

 

Enter Modbus sub-address :

 always 0 (phase 1); always 1 (phase 

2); always 2 (phase 3);

 

7.

 

Log type: Only if you're working on charging data to a central 
server check the parameters you want 

8.

 

Choose unit kWh(automatic) 

9.

 

Press "ZEND" if Module OK appears the programming is in order 
otherwise Module NOK see manual (Modbus address error, 
cabling check,...) 

4. Read values on the display 

There are 4 touch buttons by pushing on this momentarily you can read the 
following readings: 

Button1 U/I (voltage/currents):

 voltages between phase Neuter Volt→ flow 

per phase in Ampere→ Harmonic on voltage between phase and neuter THD 
in %→ Harmonic on current THD in %→ 

Button 2 M (frequency, PF, peak):

 

 frequency and power factor→ power 

factor per phase → maximum flow per phase with set sample  me a er 
reset→ maximum total power set sample  me a er reset Button 

3 P (capabilities):

 

 current active power per phase in kW→ current reac ve 

power per phase in kVar→ current VA per phase in kVA→ total power in kW, 
KVar, kVA 

Button 4 E (energy consumption meter reading)*:

 

 meter reading total 

active consumption in kWh→ meter posi on total reac ve consump on in 
kVarh→ meter posi on import ac ve consump on in kWh → meter posi on 
export active consumption in kW → meter posi on import ac ve 
consumption in kVarh → meter state export ac ve consump on in kVarh → 

*

beware

 

 meter reading on 2 lines as 1 line: 

 

0001 04.80

 

 kWh=104.80kWh 

5. What values are logged. 

MEMo logs every 60 seconds:  

 

Total active consumption over the 3 phases: 

o

 

Meter mode import in kWh 

o

 

Meter mode export in kWh 

 

By phase: 

o

 

Tension in Volt 

o

 

Power in Ampère 

o

 

Power in Watt 

o

 

Power factor 

o

 

Reactive capability VAR 

6. General note: 

 

Import consumption over the 3 phases, in the html chart only with 
1 hour resolution, is calculated on the basis of difference between 
start and end counter position and the result you see in the web 
server below the chart of phase 1 (Modbus sub-address0).

 

Export 

consumption 

 

can be found in the web server under phase

 

(Modbus sub-address 1),see FAQ on 2-wire.be 

 

The current counter positions import and export can be read in 
the web server (light green values) by pressing 'AUTO REFRESH'.  

 

Via button E on the display is ToTal

 

 Energy = Export in 

kWh 

 

3x380V NEUTERLESS:

 

connect as 3x230V and set as 3P3 

 

Visualization of the channels for the customer : see WS.502

 

 web 

server 

 

Because the web server cannot show 

negative graphs, the Energy meter for solar 
panels must be connected in the direction of 
the current.  

 

If current power is at 0 in the web server 

then check flow direction coils via display  

 

Rinsing flow direction is wrong if PF or power 

on the display is negative, 

Never swap wires 

from coils around current feeder but open and 
turn the coil to avoid power surge!!! 

 

In the case of 3x230Volt, current power Phase 2 

 

is always shown 

as zero in the web server because this calculated power is 
negative and the web server does not show any negative values. 

 

Flow-rinse guides may be extended a few meters but with at least 
the same section 

 

The comprehensive (English) manual with all technical 
specifications, detailed configuration, Modbus registers is 
available through our website www.2-wire.net 

7. Installation instructions  

The installation must be carried out by an approved installer and in 
accordance with the rules in force. 

 

This device is only suitable for DIN rail assembly in accordance 

with EN 50022 and must be fitted in a closed distribution 
board. 

 

Make sure that a safety interruption of the device is possible. 

Turn off the module before installing it. 

 

Do not open the device – the warranty expires when the 

device is opened. 

This manual must be attached to the file of the electrical installation. The 

2-Wire website always has the latest manual of the product. 

8. Support 

Do you want to exchange the product in case of a possible defect? Please 

contact your wholesaler or the 2-wire support service. The contact details 

can be found on our website www.2-wire.net/contact/ 

9. Guarantee conditions 

The warranty period is two years from delivery date. The date of delivery 
is the invoice date of purchase of the product by the consumer. If there is 

no invoice available, the production date applies. 

The consumer is obliged to inform Qonnex bvba in writing of the lack of 
conformity, and this at the latest within two months of adoption. In the 

event of a lack of conformity, the consumer is only entitled to a free 
repair or replacement of the product, which is determined by Qonnex. 

Qonnex is not responsible for any defect or damage caused by improper 

installation, improper or negligent use, improper operation, product 
transformation, maintenance in violation of maintenance regulations or 

an external cause such as moisture damage or damage from span. 

The mandatory provisions in national legislation on the sale of consumer 
goods and the protection of consumers in countries where Qonnex sells 

directly or through distributors, agents or permanent representatives take 
precedence over the above provisions 

 

Qonnex 
B-9310 Aalst 

Belgium 

[email protected]

 

www.2-wire.net

 

 

 

Reviews: