Heater Control Switch: Press lower position of the switch to heat with the 2 drying boxes, at same time the fan in the
3
.
drying boxes begin to work; press upper position of the button to heat with the right drying box; Press “OFF” in middle
of the button will stop heating. The fan on the drying box will automatically stop work after 2 minutes later.
The Motor Switch of the collecting roller for pictures: when this switch is in “ON” position and to be pushed upward, the
4.
motor will turn on. Rotate the speed-adjusting button. The collecting roller for pictures will work.
The speed-adjusting button for the collecting roller for pictures: turn on the Motor Switch of the collecting roller for
5.
pictures, rotate the speed-adjusting button in clockwise or counter-clockwise to increase or decrease the speed.
Work-state-selection switch of the collecting roller for pictures: when the switch is in upper position “ON”, the roller
6.
will run in positive direction. When the switch is in lower position “OFF”, it is in Free State. At this time, you can take the
picture off.
Liquid pump switch: Press upper position “ON” of the switch, the switch lamp will be on, and the pump will begin to
7.
work. Rotate the liquid pump valve. Liquid will be supplied onto the picture. Pressing the lower position “OFF” of the
switch, the pump will stop work. At same time, switch off the valve.
Fan cooler switch: Press upper position “ON” in the switch, the cooler will begin to work; Press lower position “OFF” in the
8.
switch, the cooler will stop work. The speed-adjusting button, equipped in right frame, can regulate the cooler speed.
Drying box lifting switch: Press the upper position “ON” of the drying box lifting switch”, the drying box will lower down;
9.
Press the lower position “OFF” of the drying box lifting switch, the drying box will lift up. The drying box will lower down
automatically without compressed air.
1
0
.
Digital temperature controller: Using TH8 digital temperature controller, its
measuring accuracy is 0.5% with resolution of 1 °C. This machine has been
set and tested well in functions before ex-factory. The users only need to set
temperature according to laminating requirement. “SV” displays the setting
temperature value. “PV” displays the measured temperature. The method is to
keep pressing the SET (DISP) for 3 seconds to enter into the PID Adjustment
Menu in display measurement mode. If you want to modify the setting value,
press SET +
∧
keys at the same time. The nixie tube will flash, and then jog the
∧
key to change the modifying bits. Press
∧/∨
keys to modify the data. Press
SET to confirm the entry. Please refer to the Manual for the controller to set
other parameters.
notice:
①
The temperature displayed on the meter is the temperature inside the drying boxes, not the temperature of hot air at
the outlet of the drying boxes.
②
The operating instruction attached the machine for your reference.
Ⅴ
. Liquid laminating operating procedures
Compressed air: connect the compressed air pipeline with the joint at the left side in the rear of the machine. Then turn
1.
on the air supply valve for compressed air when it is confirmed that every thing is OK. The display pressure is about 0.6
Mpa.
Adding liquid: check plastic pipes for the connection between liquid tank and pump, the connection between pump
2.
and nozzle, the connection between liquid collector and the tank. Then add liquid into the tank.
Test run and preheating: Turn on the main switch (see Back View Fig.2) and test running the machine when air pressure
3
.
reaching 0.6 Mpa (6 kgf/cm2). To do as following procedure: Press the power switch “ON” to connect power supply;
the switch lamp will be on. Press the drying box switch to let it lift and fall. Press the switch for the wiping rod and the
guiding roller to let it lift and fall. Press the heating switch, hot air should come out from the bottom of the drying
boxes. Then press upper position “ON” of the motor switch for collecting roller. Then rotate speed-adjusting button in
clockwise to let collecting roller for picture work. Press the liquid pump switch and open the valve for liquid supply.
After a while, the liquid will flow out. The liquid flowed out will come into the liquid collector and return back to the
liquid tank.