
3–Installation
Installation Tasks Checklist
IB0054611-00 A
3-3
Aisle Width
Position the chassis on front on the rack: Use a pallet jack to move the chassis.
Orient the chassis on the pallet in front of the rack as shown. The chassis rear
should be facing the front of the rack. For installations in racks arranged in rows,
the distance between adjacent rows of racks (i.e., the width on a cold aisle) should
be greater than 36" to be able to move the chassis on a pallet through a cold aisle.
Figure 3-1. Positioning the Switch