63
4
63
CONTENT
1. Safety precautions
2. Items packed with the unit
2.1 items packed with the unit (for SC42xx & SC52xx models)
2.2 items packed with the unit (for S42xx & S52xx(B) & SJA2519 models)
3. Activities for installing the air conditioner for the SC42xx & SC52xx models.
4. Activities for installing the air conditioner for the S42xx & S52xx(B) & SJA2519
models.
5. Determining the location of the inside and outside unit.
5.1 Determining the location of the inside and outside unit for the S42xx,
S52xx(B) & SJA2519, SC42xx & SC52xx models.
5.2 Determining the location of the exterior unit for the S42xx, S52xx(B) &
SJA2519, SC42xx & SC52xx models.
6. Possibilities for installing the piping from the interior unit to The exterior unit.
7. Mounting the installation plate and making the piping feedthrough.
7.1 Mounting the installation plate of the interior unit.
7.2 Drilling the piping, condensation hose and cable feed-through.
8. Connection the coolant pipes.
8.1 Connecting and disconnecting the coolant pipes for the SC42xx & SC52xx
models.
8.2 Connecting the coolant pipes for the S42xx & S52xx(B) & SJA2519 models.
9. Connection the condensation drainage hose for the S42xx, S52xx(B) & SJA2519,
SC42xx & SC52xx models.
9.1 Connection the condensation drainage hose to the interior unit.
9.2 Drain joint installation.
10. Electrical work.
11. Connecting the electrical cables.
11.1 Connecting the electrical cables for the SC42xx & SC52xx models.
11.2 Connecting the electrical cables for the S42xx & S52xx(B) & SJA2519
models.
12. Evacuating the cooling system of the S42xx & S52xx(B) & SJA2519 models.
13. Checking the cooling system for leakage on the S42xx, S52xx(B) & SJA2519,
SC42xx & SC52xx models.
14. Topping up coolant for piping lengths above 05 metres.
15. Test running after installation.