background image

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO M-G11.X

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO M-G11.X

4

5

1 Introduction

Validity

These instructions are only valid for crystalline solar modules 

from the company Qcells as specified at chapter "2.1 Technical 

specifications". Qcells assumes no liability for damage resulting 

from failure to observe these instructions.

  Please observe the wiring and dimensioning of the system.

  The installer of the system is responsible for compliance with 

all necessary safety regulations during set-up and installation.

Qcells assumes no liability on the basis of these instructions. 

Qcells is only liable in the context of contractual agreements or 

in the context of accepted guarantees. Qcells accepts no other 

responsibility for the functionality and safety of the modules.

  Please observe the instructions for any other system 

components that may be part of the complete solar power 

system. It may be necessary to carry out a structural analysis 

for the entire project.

Additional information for the Operator

  Please keep this manual for the entire life of the solar power 

system.

  Please contact your system supplier for information concerning 

the formal requirements for solar power systems.

  Please be sure to contact the relevant local authorities 

and energy providers regarding regulations and permit 

requirements prior to installation of the solar power system. 

Your financial success depends on the fulfillment of these 

requirements.

Other applicable documents

In addition to this Manual following technical information are 

relevant:

Document type

Product data sheet
Packaging and transport information

 

MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS 

THE LIMITED WARRANTY AND MAY CREATE A SAFETY 

HAZARD AND RISK PROPERTY DAMAGE. THIS INCLUDES 

IMPROPER INSTALLATION OR CONFIGURATION, IMPROPER 

MAINTENANCE, UNINTENDED USE, AND UNAUTHORIZED 

MODIFICATION.

2 Planning

2.1 Technical specifications

For additional information see the relevant datasheet of the module provided at www.qcells.com.

PRODUCT LINE

Q.PEAK DUO M-G11

Q.PEAK DUO M-G11+

Q.PEAK DUO BLK M-G11

Q.PEAK DUO BLK M-G11+

Type

Q.ANTUM DUO Z

Length

1692mm

Width

1134 mm

Frame height

30 mm

Area

1.92 m²

Weight

21.2 kg

Max. system voltage V

SYS

1000 V

Max. reverse current

25 A

Permissible temperature range

–40 °C to +85 °C (–40 °F to +185 °F)

Junction box protection class

IP67 with bypass diode

Connector protection class

IP68

Fire rating based on ANSI / UL 61730

C / Type 2

Max. test load Push / Pull

1

5,400 Pa / 3,600 Pa

Max. design load Push / Pull

1

3,600 Pa / 2,400 Pa

Certificates

CE-compliant; IEC 61215:2016; IEC 61730:2016; PV module classification: Class II; 

QCPV

1

 Test and design load in accordance with IEC 61215:2016, depending on mounting options (see section "2.3 Mounting options")

ASYMMETRIC Q.PEAK DUO M-G11 30T 

1134 mm

980 mm

1692 mm

30 mm

4 × Mounting slots (DETAIL A)

8 × Drainage holes

3 × 6 mm  

Frame

1092 mm

AU/

EN

356 mm

Label

4 × Grounding holes, Ø 4.5 mm

DETAIL A

16 mm

8.5 mm

21.1

 mm

≥ 1250

 mm

≥ 1250

 mm

Fig. 1: 

External dimensions and components for Q.PEAK DUO M-G11, Q.PEAK DUO M-G11+, 

Q.PEAK DUO BLK M-G11 and Q.PEAK DUO BLK M-G11+..

Attention!

This marking indicates that this product should not be disposed 

of with other household waste within the EU. Recycle this product 

properly to prevent possible damage to the environment or 

a risk to human health via uncontrolled waste disposal and in 

order to promote the sustainable reuse of material resources. 

Please return your used product to an appropriate collection 

point or contact the retailer where you purchased this product. 

Your retailer will accept used products and return them to an 

environmentally-sound recycling facility.

Summary of Contents for Q.PEAK DUO M-G11.X Series

Page 1: ...Installation and operation manual Q PEAK DUO M G11 X solar module series...

Page 2: ...f the solar modules This manual Other applicable stipulations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations an...

Page 3: ...RRANTY AND MAY CREATE A SAFETY HAZARD AND RISK PROPERTY DAMAGE THIS INCLUDES IMPROPER INSTALLATION OR CONFIGURATION IMPROPER MAINTENANCE UNINTENDED USE AND UNAUTHORIZED MODIFICATION 2 Planning 2 1 Tec...

Page 4: ...ned to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Avoid the usage of different metals to p...

Page 5: ...ollowing clamp parameters clamp width 40mm and clamp depth 10mm The system installer is responsible for the determination of location specific load requirements Ensure that the connection cables of th...

Page 6: ...mum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maxim...

Page 7: ...tion cables or junction box Carry modules upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects...

Page 8: ...ctric arcs may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that th...

Page 9: ...nly be performed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and...

Page 10: ...7 Disposal Do not disconnect modules by yourself Please contact an installer or Qcells Technical Customer Service Department Dispose of modules in accordance with the local disposal regulations Ensure...

Page 11: ...ay occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of the art and taki...

Page 12: ...on manual solar modules Q PEAK_DUO_M G11 X_modules_series_2022 06_Rev01_EN Hanwha Q CELLS GmbH OT Thalheim Sonnenallee 17 21 06766 Bitterfeld Wolfen Germany EMAIL WEB TEL FAX sales qcells com www qcel...

Reviews: