![background image](http://html1.mh-extra.com/html/qcells/q-home-core-a5/q-home-core-a5_installation-quick-manual_3127715055.webp)
55
Appendix A Commissioning Report
Installer Information
End User Information
Name :
Name :
Phone :
Phone :
Address :
Address :
Commissioning Report (1/2)
Home ID (9 digits)
:
Q.HOME (Q.VOLT) S/N (18 digits)
:
Home ID (9 digits) provided to end user? :
Yes / No
Activation Code (4 digits) provided to end user?
:
Yes / No
Server registration successfully completed?
:
Yes / No
Use precautions explained to end user?
:
Yes / No
Precautions
■
If the ESS cannot remain connected to grid AC power after commissioning, the PV Switch on
the Q.VOLT and the Battery DC Switch on the Q.SAVE must be switched OFF in order to avoid
any damage to the Battery Pack.
■
In case you install more than two Q.SAVEs to one Q.VOLT, make sure to plug a BMS
Communication Cable to the “OUT” terminal on the Q.SAVE for Q.VOLT connection, and plug
another cable to the “IN” terminal for the next Q.SAVE connection.
■
Make sure to complete all configurations before switching ON the PV Switch and the Battery
DC Switch for safety.
Please, go to the next page
Do You Have Any Comments?
Installer Signature
End User Signature
Date :
Date :
Signature :
Signature :
Summary of Contents for Q.HOME CORE A5
Page 1: ...INSTALLATION QUICK GUIDE Q HOME CORE A5...
Page 52: ...52 7 Check region and time 8 Set system parameters...
Page 58: ...58 MEMO...
Page 59: ...59 MEMO...