INSTALLATION  

QUICK GUIDE

Q.HOME CORE

A5

Summary of Contents for Q.HOME CORE A5

Page 1: ...INSTALLATION QUICK GUIDE Q HOME CORE A5...

Page 2: ...ESS Service for Europe Germany E Service Supro GmbH Augustenh he 8 06493 Harzgerode Germany EMAIL q home e service48 de TEL 49 0 39484 9763 85 Hanwha Q CELLS Australia Pty Ltd Suite 1 Level 1 15 Blue...

Page 3: ...8 3 Installation Requirements 13 8 4 Wall Mount 15 8 5 Stand for Floor Mount Option 16 9 Connecting the Cables 18 9 1 Connectors Layout 19 9 2 Opening the Covers 20 9 3 Wiring Cables Inside the Inver...

Page 4: ...gle phase 42 10 11 CT Wiring in AC Coupled 44 11 Connecting the Inverter to Battery Packs 45 12 Power On 47 13 LED Status 48 14 Connecting to the Internet 49 15 Commissioning the System 49 15 1 Connec...

Page 5: ...ple have to carry and take it out Do not operate with other components not approved by Qcells Connecting other products to Qcells products may result in abnormal operation All tasks regarding the PV m...

Page 6: ...ick guide 1EA Wall mount bolt anchor 6EA Bracket mount bolt M6 2EA Q SAVE Package Contents QuickGuide Q SAVE Battery 1EA Mounting bracket 1EA Quick guide 1EA Wall mount bolt anchor 6EA Bracket mount b...

Page 7: ...Wi Fi LTE waterproof cover CT Current Transformer CT cable 3m CT Extension Cable 20m BMS communication extension cable 1m multi linkable Energy Meter EM24 EM112 Energy Meter EM530 EM540 Battery Power...

Page 8: ...ountry of Manufacturer Republic of Korea GRID DATA AC Max Apparent Power Rated Output Power kVA kW 5 0 5 0 Nominal Voltage Range V 230 180 to 260 Nominal Grid Frequency Range Hz 50 60 5Hz to 5Hz Feed...

Page 9: ...Battery Pack Converter Technology Non isolated Rated Battery Voltage Battery Voltage Range VDC 202 8 168 0 to 228 2 Maximum charging Discharging current A 16 9 20 for each Q SAVE unit Depth of Discha...

Page 10: ...IN BAT IN BAT IN BAT OUT BAT OUT BMS OUT CAN BMS OUT CAN BMS IN CAN BMS IN CAN BMS IN CAN USB Wi Fi Dongle Q VOLT PV Inverter CT TT Network System Single Phase Main Load L PE N PE LAN DRM RS 485 GRID...

Page 11: ...BAT IN BAT IN BAT OUT BAT OUT BMS OUT CAN BMS OUT CAN BMS IN CAN BMS IN CAN Ext current PV Inverter CT TT Network System Three Phase Circuit Breaker PE LAN DRM RS 485 GRID LOAD PE Circuit Breaker Circ...

Page 12: ...W2 is battery breaker SW3 is grid breaker SW5 is main load breaker SW6 is total grid breaker SW4 is sub_load breaker 2 MEN Link The INVERTER maintains connection for the internal relay RL603 RL601 on...

Page 13: ...if the product is damaged or malfunctions due to this the product may be excluded from the warranty Installation Environment For convenient maintenance install the inverter at eye level Secure the spa...

Page 14: ...icient heat mission a sufficient distance should be secured from the surrounding objects and sufficient space for cable connection is required 300mm 300mm 300mm 300mm 600mm Mounting Hole Dimensions 41...

Page 15: ...Mounting hole 9 2 Insert an anchor into the hole and fix the bracket with a bolt Use the wall mount bolts included in the Q VOLT package At least 4 bolts are required to secure the bracket 3 Place the...

Page 16: ...the stand legs Bolt M8 16 included in the package 2 Fix the bracket to the stand legs Bolt M8 45 Use the wall mount bolts included in the Q VOLT package 3 Fix the stand on the floor Mounting hole 17...

Page 17: ...17 4 Place the product on the bracket secure the product to the bracket using the M6 bolt See steps 3 and 4 in the 8 4 Wall Mount...

Page 18: ...be replaced only by qualified personnel If the battery needs to be replaced you must use a battery that meets the manufacturer s specifications Make sure to match the polarity of the cables properly...

Page 19: ...9 9 1 Connectors Layout 2 4 8 9 1 3 5 7 6 1 1 2 2 F NO CONNECTORS WIRE SIZE 1 Battery 6mm2 2 BMS Communication 3 Grid 6mm2 4 Load 6mm2 5 RS 485 6 COM 7 COM Spare 8 LAN DRM RJ45 Category 5E 9 Wi Fi LTE...

Page 20: ...Front Cover To remove the front covers from the inverter and battery packs After pressing the latch at the bottom of the cover raise the cover upward to open it Opening the Wiring Cover Remove the 9 b...

Page 21: ...5001 1 2 4 5 3 HCORE5001 HCORE 9 6 8 6 8 9 7 7 1 Load 6 RS485 for Energy Meter 2 Grid 7 Optional RS485 for Secondary Energy Meter 3 Ext comm 2 8 Battery for Dark Start 4 Ext comm 1 9 LAN DHCP 5 Ext CT...

Page 22: ...mm Tighten the sealing nut Tightening torque range 5 to 15kgf cm 9 5 Closing the Covers Note Before close the covers complete the energy meter and CT installation Fore details about installing energy...

Page 23: ...23 2 Close the outer cover a Insert the cover to fit into the grooves on the main body b Slide it down while pressing the front side against the latch at the bottom...

Page 24: ...Mains N L1 L2 L3 41 42 1 N L1 L2 Utility Meter 1 L3 PV INV Q HOME CORE CB Main CB PV CB Load CB Critical Load CB Main Load Critical Load 3 4 1 2 Optional Secondary Energy Meter Energy Meter N N L1 L2...

Page 25: ...85_POS 42 B 4 RS485_POS 42 B QCORE5001H QCORE5001A 1 2 3 1 2 3 4 4 1 RS485_NEG 41 A 3 RS485_NEG 41 A 2 RS485_POS 42 B 4 RS485_POS 42 B Energy Meter Settings Application F SYS 3P n P int ti 1 ModBus Ad...

Page 26: ...vazzi Single Phase Energy Meter Wiring Grid Mains N L1 1 Utility Meter Main CB Q HOME CORE CB Load CB Critical Load CB Critical Load Main Load 1 2 N N L1 Q VOLT Load Off grid Grid RS485_NEG RS485_POS...

Page 27: ...POS 42 B QCORE5001H QCORE5001A 1 2 1 2 1 RS485_NEG 41 A 2 RS485_POS 42 B Energy Meter Settings Application F SYS 1P P int ti 1 ModBus Address 1 default value Baudrate 9600 default value Note Put the e...

Page 28: ...lo Gavazzi Single Phase Energy Meter Wiring N L1 2 1 Utility Meter Q HOME CORE CB Load CB Critical Load CB Critical Load Main Load Grid Mains N N L1 Main CB Q VOLT Load Off grid Grid RS485_NEG RS485_P...

Page 29: ...S485_NEG 3 5 A 2 RS485_POS 4 B QCORE5001H QCORE5001A 1 2 1 2 1 RS485_NEG 3 5 A 2 RS485_POS 4 B Energy Meter Settings Measure b Tariff Yes Address 1 Baud 9 6 Note For EM112 the total power value may di...

Page 30: ...7 18 RS485 INPUT kwh kW h ToT Rx Tx RS485 INPUT Utility Meter P1 P2 CT P1 P2 CT P1 P2 CT Q HOME CORE CB Main CB P1 P2 CT P1 P2 CT P1 P2 CT PV INV Load CB Main Load Critical Load CB Critical Load Optio...

Page 31: ...2 RS485_POS 8 B 4 RS485_POS 8 B QCORE5001H QCORE5001A 1 2 3 1 2 3 4 4 1 RS485_NEG 9 A 3 RS485_NEG 8 B 2 RS485_POS 8 B 4 RS485_POS 9 A Energy Meter Settings Measure C SYS 3P n Current Ratio 20 ModBus A...

Page 32: ...se Energy Meter Wiring Q VOLT Load Off grid Grid RS485_NEG RS485_POS 1 2 N L1 kwh kW h ToT Rx Tx 1 8 9 13 14 RS485 INPUT N Q HOME CORE CB Critical Load CB Load CB CT P1 P2 N N L1 Main CB Grid Mains Ut...

Page 33: ...485_POS 8 B QCORE5001H QCORE5001A 1 2 1 2 1 RS485_NEG 9 A 2 RS485_POS 8 B Energy Meter Settings Measure C SYS 2P Current Ratio 20 ModBus Address 1 default value Baud Rate 115200 Note Open the sliding...

Page 34: ...Q HOME CORE CB PV INV Critical Load CB PV CB Load CB Critical Load kwh kW h ToT Rx Tx 8 9 4 5 6 RS485 INPUT GND N 1 2 3 kwh kW h ToT Rx Tx N 1 2 3 8 9 4 5 6 RS485 INPUT GND Main Load Optional Secondar...

Page 35: ..._NEG 9 A 2 RS485_POS 8 B 4 RS485_POS 8 B QCORE5001H QCORE5001A 1 2 3 1 2 3 4 4 1 RS485_NEG 9 A 3 RS485_NEG 8 B 2 RS485_POS 8 B 4 RS485_POS 9 A Energy Meter Settings Measure c SYS 3P n ModBus Address 1...

Page 36: ...e phase Energy Meter Wiring Q VOLT Load Off grid Grid RS485_NEG RS485_POS 1 2 N L1 Grid Mains Utility Meter Q HOME CORE CB Critical Load CB Load CB kwh kW h ToT Rx Tx 8 9 4 RS485 INPUT GND N 1 N N L1...

Page 37: ...9 A 2 RS485_POS 8 B QCORE5001H QCORE5001A 1 2 1 2 1 RS485_NEG 9 A 2 RS485_POS 8 B Energy Meter Settings Measure c SYS 2P ModBus Address 1 default value Baud Rate 115200 Note Open the sliding terminal...

Page 38: ...ion P2 Load P1 Grid S1 S2 CT for L1 S1 3 S2 1 CT for L2 S1 6 S2 4 CT for L3 S1 9 S2 7 Q VOLT Load Off grid Grid RS485_NEG RS485_POS 1 3 2 4 N L1 L2 L3 Utility Meter Optional Secondary Energy Meter N L...

Page 39: ...01A 1 2 3 1 2 3 4 4 1 RS485_NEG 25 B 3 RS485_NEG 25 B 2 RS485_POS 24 A 4 RS485_POS 24 A QCORE5001H QCORE5001A 1 2 3 1 2 3 4 4 1 RS485_NEG 25 B 3 RS485_NEG 25 B 2 RS485_POS 24 A 4 RS485_POS 24 A Energy...

Page 40: ...Wiring L N 1 2 9 10 N L1 Critical Load CB P1 P2 CT 1 2 Critical Load N N L1 Load CB Q HOME CORE CB Main Load Main CB CT direction P2 Load P1 Grid S1 S2 S1 9 S2 10 Q VOLT Load Off grid Grid RS485_NEG R...

Page 41: ...name Q VOLT to Energy Meter HCORE5001H HCORE5001A 1 2 1 2 1 RS485_NEG 25 B 2 RS485_POS 24 A QCORE5001H QCORE5001A 1 2 1 2 1 RS485_NEG 25 B 2 RS485_POS 24 A Energy Meter Settings ModBus Address 1 Baud...

Page 42: ...le phase Energy Meter Wiring L N 1 Type of wiring 1P2W 3 2 4 N L1 1 2 Critical Load N N L1 Main Load Utility Meter Grid Mains Q VOLT Load Off grid Grid RS485_NEG RS485_POS 1 2 Critical Load CB Load CB...

Page 43: ...name Q VOLT to Energy Meter HCORE5001H HCORE5001A 1 2 1 2 1 RS485_NEG 25 B 2 RS485_POS 24 A QCORE5001H QCORE5001A 1 2 1 2 1 RS485_NEG 25 B 2 RS485_POS 24 A Energy Meter Settings ModBus Address 1 Baud...

Page 44: ...44 10 11 CT Wiring in AC Coupled Attach a CT to the wire from the PV inverter to the grid K L N L1 L K CT Grid Energy Meter CT Cable Default 3m or Option 20m Ext CT port PV Inverter Main Load...

Page 45: ...tric shock or the product may permanently be damaged This damage is not covered by the warranty Before batteries are connected all other connections should be done and the battery interrupter must be...

Page 46: ...rmination resistance must be set only for the last battery connected If more than one battery is connected turn off all the termination resistance switches except the last battery OFF ON For exmaple W...

Page 47: ...switch Using the Dark Start button If there are no PV and Grid connect the battery to PCS and press the Dark Start button for about 10 seconds Once the power is supplied and the LED turns blue release...

Page 48: ...g or discharging in online mode Flashing Standby in online mode Magenta Solid Charging or discharging in offline mode Flashing Standby in offline mode Green Solid Charging or discharging in off grid m...

Page 49: ...lease CAT 5e Refer to the block diagram below and 15 2 Local Commissioning with the Q OMMAND GO App on page 50 LAN cable Wi Fi Internet Service Provider 15 Commissioning the System 15 1 Connecting to...

Page 50: ...e To get started with Q HOME CORE you should register your product on the server using Q OMMAND PRO first After that visit the site and complete the initial setup with Q OMMAND GO This way you can dow...

Page 51: ...ting mode on The setting mode will be automatically turn off after 1 hour To turn the setting mode back ON OFF please press the white button on the dongle for 2 seconds 4 Select your language and ente...

Page 52: ...52 7 Check region and time 8 Set system parameters...

Page 53: ...product on the server by using the Q OMMAND Pro app Search and install Q OMMAND Pro on the Apple AppStore or Google Play Store or use the QR code below Android iOS 17 Submitting the Commissioning Rep...

Page 54: ...he DC switch on the hybrid inverter must remain switched on to avoid deep discharge of the battery Alternatively the device can also be switched off completely see Turning off the System in Installati...

Page 55: ...id AC power after commissioning the PV Switch on the Q VOLT and the Battery DC Switch on the Q SAVE must be switched OFF in order to avoid any damage to the Battery Pack In case you install more than...

Page 56: ...ty only covers failures or malfunctions that result from demonstrable material or workmanship defects or occur under normal use conditions during the warranty period The warranty will not apply if The...

Page 57: ...Circuit Breaker Type __________ Backup Power Circuit Breaker Ratings __________ A Bypass Switch Installed Yes No Backup Power RCD Installed Yes No Backup Power RCD Type __________ Backup Power RCD Ra...

Page 58: ...58 MEMO...

Page 59: ...59 MEMO...

Page 60: ...lee 17 21 Bitterfeld Wolfen OT Thalheim 06766 Germany Hanwha Q CELLS Australia Pty Ltd Suite 1 Level 1 15 Blue Street North Sydney NSW 2060 Australia TEL WEB WEB 49 3494 6699 23333 www q cells eu www...