English
27
11.4
CT Wiring
CT is needed in A4 only. H4 do not require CT installation.
Attach a CT to the wire from the PV inverter to the grid (K L).
N
L1
L
K
CT
Grid
Energy
Meter
CT Cable
(Default 3 m or Option 20 m)
Ext. CT port
PV Inverter
Main
Load