background image

9919-161 

 

Rev 04112018 

 

 

Maintenance of QA1 Ultimate Ball Joints 

 

Grease using high quality NLGI #2 GC-LB Lithium based grease

 

and check preload on a regular basis. Check and 

set ball joint preload at least annually or every 3,000 miles, whichever comes first. NOTE: Preload on the ball 
stud can be set with the ball joint attached to the control arm if the spring is unloaded and the ball joint taper is 
free from the spindle.  

 

1.  Using the QA1 spanner socket from Ball Joint Tool Kit (p/n 1891-106) loosen the lock nut by turning counter 

clockwise. 

 

2.  Using the QA1 hex key, torque the torque nut to 25-30 in. lbs. and then back off 90°.   

 

3.  Using the QA1 hex key, a ½’’ open-ended wrench or socket, and the QA1 spanner wrench, tighten the lock 

nut while holding the torque nut, locking them together to 25 ft. lbs.  

 

4.  Re-check the lash on the ball stud and adjust as needed. The ball stud should not have any axial lash. 

 

Reviews: