31
Section 7. Start Up
7. Start Up
Overview
See
LX-5090-TM Q-SUN Xe-1 Technical Manual
or
LX-5090B-TM Q-SUN Xe-1 basic Technical Manual
for a
complete guide to the programing and operation of the Q-SUN Xe-1 Xenon Test Chamber.
7.1. Specimen Mounting (May 2020)
●
Specimens are placed on the tray in the test chamber (
●
Specification Bulletin LX-5047
for specimen mounting guidelines and available holders.
Figure 7.1: Xe-1 Specimen tray pulled out and specimens placed on tray.
7.2. Q-SUN Xe-1 All “E” Models Control Panel (May 2020)
●
The power switch is located on the tester control panel (
).
●
Two touch screen displays provide for control and monitoring of tester operation (
).
●
The Menu Screen provides functions for setting up and running test cycles, calibration of sensors, viewing diagnostic
information, and display of error messages. (
●
The Status Screen display shows test setup parameters and provides real-time data on actual test conditions
(
).
Figure 7.2a: Power switch on Xe-1-SE, Xe-1-BCE, Xe-1-SCE, and Xe-1-WE control panel.