INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G9.2 – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G9.2 – Q CELLS

Validity

These instructions are only valid for crystalline solar modules from 
the company Q CELLS as specified at chapter „2.1 Technical 
Specifications“. 
Q CELLS assumes no liability for damage resulting 
from failure to observe these instructions.

 

Ä

Please observe the wiring and dimensioning of the system.

 

Ä

The installer of the system is responsible for compliance with all 
necessary safety regulations during set-up and installation.

Q CELLS assumes no liability on the basis of these instructions. 
Q CELLS is only liable in the context of contractual agreements 
or in the context of accepted guarantees. Q CELLS accepts no 
other responsibility for the functionality and safety of the modules.

 

Ä

Please observe the instructions for any other system compo-
nents that may be part of the complete solar power system. 
It may be necessary to carry out a structural analysis for the 
entire project.

 

Ä

If your questions are not satisfactorily answered in the manual, 
please contact your system supplier.

Additional information for the Operator

 

Ä

Please keep this manual for the entire life of the solar power 
system.

 

Ä

Please contact your system supplier for information concerning 
the formal requirements for solar power systems.

 

Ä

Please be sure to contact the relevant local authorities and 
energy providers regarding regulations and permit requirements 
prior to installation of the solar power system. 

Other applicable documents

In addition to this Manual following technical information are 
relevant:

DOCUMENT TYPE

Product data sheet

Packaging and transport information

MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS 
THE LIMITED WARRANTY AND MAY CREATE A SAFETY 
HAZARD AND RISK PROPERTY DAMAGE. THIS INCLUDES 
IMPROPER INSTALLATION OR CONFIGURATION, IMPROPER 
MAINTENANCE, UNINTENDED USE, AND UNAUTHORIZED 
MODIFICATION.

For additional information see the relevant datasheet of the module provided at www.q-cells.com.

PRODUCT LINE

Q.PEAK DUO XL-G9.2

Type

Q.ANTUM DUO

Length

2163 mm

Width

1030 mm

Frame height

35 mm

Area

2.23 m²

Weight

26.0 kg

Max. system voltage V

SYS

1500 V

Max. reverse current

20 A

Permissible 

temperature range

–40 °C to +85 °C (–40 °F to +185 °F)

Junction box 

protection class

≥ IP67 with bypass diode

Connector protection class

IP67 or IP68

Fire rating based on 

ANSI / UL 61730

C / Type  1

Max. test load Push / Pull

1

5,400 Pa / 2,400 Pa

Max. design load Push / Pull

1

3,600 Pa / 1,600 Pa

Middle rail

Yes

Certificates

CE-compliant; IEC 61215:2016; IEC 61730:2016; PV module classification: Class II

1

 Test and design load in accordance with IEC 61215:2016, depending on mounting options (see section „2.3 Mounting Options“)

1  INTRODUCTION

2  PLANNING

2.1  TECHNICAL SPECIFICATIONS

Fig. 1: 

External dimensions (in mm) and components 
for Q.PEAK DUO XL-G9.2

AU/
EN

1030 mm

1308 mm

2163 mm

35 mm

4 × Mounting slots (DETAIL A)

Frame

979 mm

428 mm

Label

4 × Grounding holes,
Ø 4.5 mm

400 mm

8 × Mounting slots system Tracker (DETAIL B)

980 mm

790 mm

≥ 700

 mm

≥ 350

 mm

8 × Drainage holes

3 × 6 mm  

4 × Drainage holes

DETAIL A

16 mm

8.5 mm

25.5

 mm

DETAIL B

10 mm

7 mm

25

 mm

Summary of Contents for Q.PEAK DUO XL-G9.2 Series

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G9 2 solar module series Valid for Africa Europe LatinAmerica South America...

Page 2: ...pulations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable...

Page 3: ...ents prior to installation of the solar power system Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and t...

Page 4: ...tural requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ensures sufficie...

Page 5: ...he following clamp parameters clamp width 40mm and clamp depth 10mm The system installer is responsible for the determination of location specific load requirements Ensure that the subconstruction doe...

Page 6: ...n the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse current load...

Page 7: ...Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of...

Page 8: ...esult from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open ci...

Page 9: ...oceed in reverse order Danger Risk of fatal injury due to electric shock Electrical work may only be performed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables fo...

Page 10: ...Modules must be cleaned manually and only with sufficient water Protective Grounding The modules must be grounded in accordance with the local statutory regulations DANGER Risk of fatal injury due to...

Page 11: ...ectrically conductive parts WARNING Risk of falling due to unsecured access Never access the installation area alone or without taking adequate security precautions Please commission a trade specialis...

Page 12: ...manual solar modules Q PEAK DUO XL G9 2_2020 12_Rev01_AU HANWHA Q CELLS AUSTRALIA PTY LTD Suite 1 Level 1 15 Blue Street North Sydney NSW 2060 Australia TEL 61 0 2 9016 3033 FAX 61 0 2 9016 3032 EMAIL...

Reviews: