4  Electrical Connection

4.2 Electrical installation safety

4  Electrical Connection

4.3 Connection of modules

Danger! Risk of fatal injury due to electric shock!

  Be sure to maintain the time intervals as specified by 

the inverter manufacturer between switching off the 
inverter and beginning any further work.

Danger! Risk of fatal injury due to electric shock!

  Never plug or unplug the cable when under load. 

Modules must not carry any current.

1. Switch off the inverter.

OFF

EN

2. Switch off the DC circuit breaker.

3.  Measure shutdown in DC String. 

(no DC current flow).

4.  Disconnect plugs by the use of appropriate 

and qualified tools of the manufacturer.

5.  When connecting the modules proceed in reverse 

order.

Danger! Risk of fatal injury due to electric shock!

  Electrical work may only be performed by qualified 

and skilled personnel (see page 3).

  Ensure correct polarity.

  Use solar cables for the connection at the junction 

box outlet.

  Only interconnect connectors of the same type and 

manufacturer.

  According to Staubli, MC4 and MC4-Evo2 connectors 

are fully compatible with one another. Qcells accord-
ingly does not object interconnecting these particular 
connector types.

  Use minimum No. 12 AWG copper wires insulated for 

a minimum of 90 °C for field connections.

Danger! Risk of fatal injury due to electric shock!

  Ensure that all electrical components are in a proper, 

dry, and safe condition.

SOLAR

click

  Ensure for a tight connection between the plugs. 

Plugs click together audibly.

  Do not connect modules with different orientations or 

angles of inclination in the same string.

Note! Module damage may occur!

  Ensure that the cabling is not under mechanical stress 

(Comply with bending radius of ≥ 2.36 in (60 mm)).

  Ensure that the cables do not run between module 

and mounting rail or structure (danger of pinch).

  Position the wiring on the solar modules that addi-

tional shading is avoided.

Summary of Contents for Q.PEAK DUO XL-G11S /BFG Series

Page 1: ...Installation and operation manual Q PEAK DUO XL G11S X BFG solar module series...

Page 2: ...ator are responsible for com pliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the installation operation an...

Page 3: ...AGE THIS INCLUDES IMPROPER IN STALLATION OR CONFIGURATION IMPROPER MAINTENANCE UNINTENDED USE AND UNAUTHORIZED MODIFICATION Attention This marking indicates that this product should not be disposed of...

Page 4: ...Installation using a mounting structure for solar modules Mounting Structure Requirements Requirements for the mounting structure Conform to the necessary structural requirements Compliant with local...

Page 5: ...sult from the safety factor 1 5 Mounting options with clamps The illustrated installation options apply for both horizontal and vertical module orientation Module Clamp Mounting rail 4 CLAMPS ON LONG...

Page 6: ...same material properties Distance between outer edge of module and middle of the clamp 2 Planning 2 3 Mounting options Tracker mounting options Module Bolt Mounting rail TRACKER INSTALLATION USING 15...

Page 7: ...clear ance between the bottom module plane level of bottom frame leg and closest substructure element below solar module lam inate The minimum clearance is defined by the maximum test push load and t...

Page 8: ...gulations when designing the system It has to be ensured that the maximum system voltage including all necessary safety margins is not exceeded Take the voltage limit of the inverter into account when...

Page 9: ...connection cables or junction box Carry modules upright and horizontally as shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any ob...

Page 10: ...out work on the inverter and the wiring with extreme cau tion Ensure that the modules are disconnected at the inverter prior to separation Be sure to observe the time intervals specified by the invert...

Page 11: ...ectrical work may only be performed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of...

Page 12: ...n inches 0 1 7 7 0 0 0 8 0 0 08 0 79 0 47 0 08 Option A Use of a grounding lug A listed grounding lug can be bonded to the frame using the grounding holes pre drilled in the frame These holes are mark...

Page 13: ...installation area alone or without taking ade quate security precautions Please commission a trade specialist NOTE Module surface damage may occur Remove snow and ice carefully without force e g with...

Page 14: ...nstallation manual solar modules Q PEAK DUO XL G11S X BFG_modules_series_2023 10_Rev05_NA HANWHA Q CELLS AMERICA INC 400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA EMAIL WEB TEL hqc inquiry...

Reviews: