INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G10.2 / G10.c – Q CELLS
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G10.2 / G10.c – Q CELLS
14
15
DANGER! Risk of fatal injury due to electric shock!
Ä
Block off the installation zone.
Ä
Keep children and unauthorized individuals away
from the solar power system.
DANGER! Risk of fatal injury due to electric shock!
Ä
Ensure that modules and tools are not subject to
moisture or rain at any time during installation.
WARNING! Risk of injury due to falling
modules!
Ä
Secure modules during installation.
Ä
Do not install modules in windy or wet weather.
DANGER! Risk of fatal injury due to electric shock!
Ä
Only use dry, insulated tools.
Ä
Do not carry out the installation alone.
•
Only install undamaged modules and
components.
Ä
Do not modify the module (e.g. do not drill any
additional holes).
3 INSTALLATION
3.2 PREPARATION OF INSTALLATION
confirmation
letter
NOTE! Module damage may occur!
Ä
Do not stack modules.
NOTE! Module damage may occur!
Ä
Do not install modules near flammable
gas / vapors.
Ä
Do not install modules in close proximity to air
conditioning systems.
NOTE! Module damage may occur!
Ä
Do not drop modules.
NOTE! Module damage may occur!
Ä
Only make modifications to the module which have
been confirmed in writing by Q CELLS.
NOTE! Module damage may occur!
Ä
Never lift or move the module with the connection
cables or junction box.
Ä
Carry modules upright and horizontally as
shown.
NOTE! Module damage may occur!
Ä
Never step on modules.
Ä
Do not subject modules to any mechanical
stress.
Ä
Do not allow any objects to fall onto modules.
3 INSTALLATION
3.1 SAFETY AND TRANSPORT