Specifications

MODULE TYPE

MOUNTING
OPTION

POSITION OF 
CLAMPS* [MM]

TEST LOAD  
PUSH/PULL** [PA] 

DESIGN LOAD 
PUSH/PULL** [PA] 

SAFETY  
FACTOR

Q.PEAK DUO ML-G9

Q.PEAK DUO ML-G9+

Q.PEAK DUO BLK ML-G9

Q.PEAK DUO BLK ML-G9+

CL1a

150 - 450

5400/4000

3600/2660

1.5

FB1

376

FB2

376

3300/4000

2200/2660

IP1

-

3300/3300

2200/2200

CL1a

20 - 550

2400/2400

1600/1600

CL1b

20 - 550

CL3

250 - 450

3300/4000

2200/2660

CL5

short side: 100 - 250
long side: 300 - 450

3800/3800

2530/2530

CL6b

short side: 100 - 250
middle: 720 - 1120****

6000/4000

4000/2660

 

Ä

The below mounting options are only possible under certain conditions.

MODULE TYPE

MOUNTING  
OPTION

POSITION OF 
CLAMPS* [MM]

TEST LOAD  
PUSH/PULL*** 
[PA] 

DESIGN LOAD 
PUSH/PULL*** 
[PA] 

SAFETY  
FACTOR

Q.PEAK DUO ML-G9

Q.PEAK DUO ML-G9+

Q.PEAK DUO BLK ML-G9

Q.PEAK DUO BLK ML-G9+

CL2a (with 

rails)

20 - 300

2400/2000

1600/1330

1.5

CL2b (without 

rails)

20 - 300

2000/2000

1330/1330

IP2

-

2000/2000

1330/1330


** 
***
****

Distance between outer edge of module and middle of the clamp; consider further details below.
Loads according to IEC 61215-2:2016 and UL 61730.
Test procedure according to IEC 61215-2:2016 and UL 61730. Loads for these mounting options do not fulfill the requirements of the standards.
Rails must not be under the junction box.

ATTENTION

 

Ä

The loads in the table are related to the mechanical stability of the solar modules. The mechanical stability of the mounting 
system including clamps has to be evaluated by the system supplier. The Q CELLS listed test load values were determined 
with the following clamp parameters: clamp width = 40 mm and clamp depth = 10 mm. The system installer is responsible for 
the determination of location-specific load requirements.

 

Ä

CL1a at high loads (5400 / 4000 Pa): The clamp position is variable in the given range but the distance between the clamps 
along the long side of the module (span) must not be larger than 1250 mm.

 

Ä

CL1b: Using of short mounting rails are permissible, if they overlap under the module not more than 210 mm. Minimum height 
of the short mounting rails should be ≥ 35 mm (clearance between frame bottom edge and roof top).

 

Ä

Ensure, that the subconstruction does not touch the junction box (even under load). Ensure that the clamps or insertion profiles 
etc. do not touch the glass (even under load).

 

Ä

Ensure, that the connection cables of the junction box do not run between laminate and mounting rails.

 

Ä

A minimum support depth of 15 mm is required on the back side of the module for IP1, IP2, CL2b, CL3 and CL6b. The minimum 
required support depth on the module backside for CL5 is 10 mm on long frame side and 15 mm on short frame side. For IP1 
and IP2 the minimum support depth on the front side of the module should be 10 mm. 

 

Ä

CL1a, CL2a and CL3: Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between 
the module and substructure).

 

Ä

Module bends under load. Therefore, sharp objects (e.g. screws) must not be mounted near the module backside.

 

Ä

Unbalanced snow loads (e.g. snow overhangs, snowdrifts) which result in locally significantly increased loads must be removed 
or avoided by technical measures.

 

Ä

Use M8 corrosion-proof screws and washers (diameter ≥ 15.8 mm or ≥ 0.62 in) for FB1 and FB2 mounting. Mounting screws 
and washers should have the same material properties.

2  PLANNING

2  PLANNING

2.3  MOUNTING OPTIONS

2.3  MOUNTING OPTIONS

Summary of Contents for Q.PEAK DUO ML-G9 Series

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO ML G9 X solar module series Valid for Africa Europe LatinAmerica South America...

Page 2: ...uch as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and r...

Page 3: ...rior to installation of the solar power system Your financial success depends on the fulfillment of these requirements Other applicable documents In addition to this Manual following technical informa...

Page 4: ...rrosion Allows for stress free expansion and contraction due to temperature fluctuations Ensure that no additional forces are applied through the mounting system into the module except for the wind an...

Page 5: ...termined with the following clamp parameters clamp width 40mm and clamp depth 10mm The system installer is responsible for the determination of location specific load requirements CL1a at high loads 5...

Page 6: ...rence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit rever...

Page 7: ...Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of...

Page 8: ...result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open c...

Page 9: ...ed personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum 4mm2 copper wi...

Page 10: ...he cabling is not exposed and or hanging and is protected from dirt moisture and mechanical friction 4 ELECTRICAL CONNECTION 4 4 AFTER INSTALLATION No dry cleaning or use of rotating brushes Modules m...

Page 11: ...Do not carry or wear any electrically conductive parts WARNING Risk of falling due to unsecured access Never access the installation area alone or without taking adequate security precautions Please c...

Page 12: ...e 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar m...

Reviews: