background image

4

5

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G6.3 / BFG AND L-G6.3 / BGT – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G6.3 / BFG AND L-G6.3 / BGT– Q CELLS

Validity

These instructions are only valid for crystalline solar modules from 
the company Q CELLS as specified at chapter „2.1 Technical 
Specifications“. Q CELLS assumes no liability for damage resulting 
from failure to observe these instructions. 

 

Ä

Please observe the wiring and dimensioning of the system.

 

Ä

The installer of the system is responsible for compliance with all 
necessary safety regulations during set-up and installation.

Q CELLS assumes no liability on the basis of these instructions. 
Q CELLS is only liable in the context of contractual agreements 
or in the context of accepted guarantees. Q CELLS accepts no 
other responsibility for the functionality and safety of the modules. 

 

Ä

Please observe the instructions for any other system compo-
nents that may be part of the complete solar power system. 
It may be necessary to carry out a structural analysis for the 
entire project. 

 

Ä

If your questions are not satisfactorily answered in the manual, 
please contact your system supplier.

Additional information can be found on our website at 
www.q-cells.us.

Information for the Operator

 

Ä

Please keep this installation manual for the entire life of the 
solar power system.

 

Ä

Please contact your system supplier for information concerning 
the formal requirements for solar power systems.

 

Ä

Please be sure to contact the relevant local authorities and 
energy providers regarding regulations and permit requirements 
prior to installation of the solar power system. Your financial 
success depends on the fulfillment of these requirements.

Other applicable documents

This installation manual is only valid in combination with the following 

technical information.

DOCUMENT TYPE

Product data sheet

Packaging and transport information

MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS THE 
LIMITED WARRANTY AND MAY CREATE A SAFETY HAZARD 
AND RISK PROPERTY DAMAGE. THIS INCLUDES IMPROPER 
INSTALLATION OR CONFIGURATION, IM PROPER MAINTENANCE, 
UNINTENDED USE, AND UNAUTHORIZED MODIFICATION.

Fig. 1: 

External dimensions (in inch (mm)) and components for  
Q.PEAK DUO L-G6.3 / BFG and Q.PEAK DUO L-G6.3 / BGT

40.6"
(1030 mm)

51.5" (1308 mm)

81.9" (2080 mm)

1.38" (35 mm)

4 × Mounting slots (DETAIL A)

8 × Drainage holes

0.12 × 0.24" (3 × 6 mm)  

Frame

DETAIL A

0.63" (16 mm)

0.33" (8.5 mm)

0.82" (21

 mm)

38.9"
(988 mm)

DETAIL B

0.39" (10 mm)

0.28" (7 mm)

0.86" (22

 mm)

8 × Mounting slots system Tracker (DETAIL B)

38.8"

(986 mm)

15.7" (400 mm)

15.2" (386 mm)

Label

4 × Grounding holes,
Ø 0.18" (4.5 mm)

≥ 17.7" (450

 mm)

≥ 7.9" (200

 mm)

31.1" (790 mm)

For additional information see the relevant datasheet of the module provided at www.q-cells.us.

PRODUCT LINE

Q.PEAK  DUO  L-G6.3 / BFG
Q.PEAK  DUO  L-G6.3 / BGT

Type

Q.ANTUM DUO

Length [in]

81.9  (2080 mm)

Width [in]

40.6  (1030 mm)

Frame height [in]

1.38  (35 mm)

Area [yd²]

2.56  (2.14 m²)

Weight [lbs]

62.8  (28.5 kg)

Max. system voltage V

SYS

1500 V  (IEC) / 1500 V  (UL)

Max. series fuse rating

20 A

Permissible temperature range

–40 °F to +185 °F (–40 °C to +85 °C)

Junction box protection class

≥ IP67 with bypass diode

Connector protection class

IP67 or IP68

Fire rating based on ANSI / UL 61730

C / TYPE 29 (New Type is similar to Type 3 but with metallic frame)

Max. test load Push/Pull

1

 [lbs/ft²]

113 / 63  (5,400 Pa / 3,000 Pa)

Max. design load Push/Pull

1

 [lbs/ft²]

75 / 42  (3,600 Pa / 2,000 Pa)

Middle rail

No

Certificates

CE-compliant; IEC 61215:2016; IEC 61730:2016; PV module classification: Class II;  
UL 61730

1

  Test and design load in accordance with IEC 61215:2016, depending on mounting options (see section „2.3 Mounting Options“)

INTRODUCTION

PLANNING

2.1  TECHNICAL SPECIFICATIONS

Summary of Contents for Q.PEAK DUO L-G6.3 / BFG

Page 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL Q PEAK DUO L G6 3 BFG and L G6 3 BGT solar modules ...

Page 2: ... module operator are responsible for com pliance with all applicable statutory requirements and regulations Ä The following regulations and standards must be upheld at all times during the installation operation and maintenance of the solar modules Installation and Operation Manual Other applicable documents such as country specific regu lations for pressure equipment operational safety hazardous ...

Page 3: ...requirements Other applicable documents This installation manual is only valid in combination with the following technical information DOCUMENT TYPE Product data sheet Packaging and transport information MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS THE LIMITED WARRANTY AND MAY CREATE A SAFETY HAZARD AND RISK PROPERTY DAMAGE THIS INCLUDES IMPROPER INSTALLATIONORCONFIGURATION IMPROPERMAINTENANCE U...

Page 4: ...ce with UL 61730 Installation using a mounting structure for solar modules Mounting Structure Requirements Requirements for the mounting structure Conform to the necessary structural requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the façade Forces acting on the module are relayed to the mounting sub structure Ensures sufficient rear ventilation of...

Page 5: ...orientation Module Clamp Subconstruction Mounting profile 2 PLANNING 2 3 MOUNTING OPTIONS 2 PLANNING 2 3 MOUNTING OPTIONS TYPE OF INSTALLATION POINT MOUNTING SYSTEM LINEAR MOUNTING SYSTEM INSTALLATION WITH CLAMPS HYBRID CLAMPING INSTALLATION ON MOUNTING POINTS 3 94 9 84 100 250 CL5 9 84 19 7 250 500 NA FB1 4 mounting slots 15 2 386 CL1 0 8 9 8 20 250 9 8 19 7 250 500 CL3 9 8 19 7 250 500 TYPE OF I...

Page 6: ... the subconstruction does not touch the junction box even under load The clamps or insertion profiles etc do not touch the glass even under load Ä Ensure that the connection cables of the junction box do not run between the laminate and mounting rails Ä A minimum support depth of 0 59in 15mm is required on the back side of the module for IP1 IP2 CL2b and CL3 The minimum required support depth on t...

Page 7: ...deter mining the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ä Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit reverse currents that may occur we recommend using the following safety options 1 Layout wi...

Page 8: ...tally as shown NOTE Module damage may occur Ä Never step on modules Ä Do not subject modules to any mechanical stress Ä Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT DANGER Risk of fatal injury due to electric shock Ä Block off the installation zone Ä Keep children and unauthorized individuals away from the solar power system DANGER Risk of fatal injury due ...

Page 9: ...may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Ä Please be aware of that the entire open circuit voltage is active even at low levels of solar irradiation Ä Please follow the valid national regulations and safety guidelines for the installation of electrical devices and systems Ä Ple...

Page 10: ...k of fatal injury due to electric shock Ä Electrical work may only be performed by qualified and skilled personnel see page 3 Ä Ensure correct polarity Ä Use solar cables for the connection at the junction box outlet Ä Only interconnect connectors of the same type and manufacturer Ä Use minimum No 12 AWG copper wires insulated for a minimum of 90 C for field connections NOTE Module damage may occu...

Page 11: ...drilled in the frame These holes are marked with a ground symbol as shown below on the frame section drawing To install the grounding lug follow the specified instructions of the manufacturer The grounding lug should be made of stainless steel or tin plated metals such as aluminum to avoid corrosion The grounding lug should be attached to the frame grounding hole using a stainless steel screw toot...

Page 12: ...ections it has to be checked that the components are secure undamaged and clean Cleaning WARNING Risk of injury due to hot and live modules Ä Only clean modules that have cooled down Ä Do not carry or wear any electrically conductive parts WARNING Risk of falling due to unsecured access Ä Never access the installation area alone or without taking ade quate security precautions Ä Please commission ...

Page 13: ...ctrum Center Drive Suite 1400 Irvine CA 92618 USA TEL 1 949 748 59 69 EMAIL inquiry us q cells com WEB www q cells us Subject to change without notice Q CELLS Installation manual solar modules Q PEAK DUO L G6 3_BFG_BGT_2020 10_Rev01_NA ...

Reviews: